25-45-22Page 405
Feb 01/05
(2) Put the toilet shroud (1) in position.
(3) Install the screws (2).
NOTE : Make sure you install corrosion resistant steel screws____ MS24693C52.
R
R R (4) Make sure that all of the placards of the retained/new components are in the correct position and in a good condition.
R R (a) If necessary install new placards (Ref. TASK 11-00-00-400-007) and (Ref. AMM 11-32-25 P.Block 001).
5. Close-up________
Subtask 25-45-22-862-050
A. De-energize the ground service network (Ref. TASK 24-42-00-862-001).
EFF : ALL
25-45-22Page 406
HAND GRIP - REMOVAL/INSTALLATION
________________________________
TASK 25-45-23-000-001 Removal of the Hand Grip
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 25-45-23-991-001 Fig. 401
3. Job Set-up
__________ Subtask 25-45-23-861-050
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).
4. Procedure
_________ Subtask 25-45-23-020-050
A. Removal of the Hand Grip
(Ref. Fig. 401/TASK 25-45-23-991-001)
(1)
Support the hand grip (1) and remove the pins (2).
(2)
Remove the hand grip (1).
EFF : ALL
25-45-23Page 401
Hand Grip
Figure 401/TASK 25-45-23-991-001
EFF : ALL 25-45-23 Page 402
Feb 01/98
CES
TASK 25-45-23-400-001 Installation of the Hand Grip
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 25-45-23-991-001 Fig. 401
3. Job Set-up
__________ Subtask 25-45-23-860-050
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized
(Ref. TASK 24-42-00-861-001).
4. Procedure
_________ Subtask 25-45-23-210-050
A. Preparation for Installation
(1)
Clean the component interface and/or the adjacent area.
(2)
Make sure that the parts retained from the removed component are clean and in the correct condition.
(3)
Do an inspection of the component interface and/or the adjacent area.
EFF : ALL
25-45-23Page 403
Subtask 25-45-23-420-050
B. Installation of the Hand Grip
(Ref. Fig. 401/TASK 25-45-23-991-001)
(1)
Put the hand grip (1) on the special screws (3).
(2)
Install the pins (2). If the pin holes are not aligned, do the following;