A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).
EFF : ALL
25-45-15Page 401
4. Procedure
_________
**ON A/C 001-049, 051-058, 101-101,
Subtask 25-45-15-020-050
A. Removal of the Waste Chute Flap
(Ref. Fig. 401/TASK 25-45-15-991-001)
(1)
Open the access door (2) and remove the waste container (3).
(2)
If fitted, disconnect the damper (5) from the waste chute flap (1).
(3)
Remove the screws (4).
(4)
Remove the waste chute flap (1).
R **ON A/C 004-049, 053-099, 101-149, 151-199, 201-299, 301-399, 401-499, Post SB 25-1226 For A/C 004-049,053-058,101-101, Subtask 25-45-15-020-050-A
A. Removal of the Waste Chute Flap (Plastic)
(Ref. Fig. 401A/TASK 25-45-15-991-001-A)
(1)
Open the access door (2) and remove the waste container (3).
(2)
Remove the screws (6) and the washers (5).
(3)
Remove the waste chute flap (1) from the hinge (4). NOTE : The waste chute flap must be removed from under the wash
____
basin.
EFF : ALL
25-45-15Page 402
Waste Chute Flap Figure 401/TASK 25-45-15-991-001
R EFF : 001-049, 051-058, 101-101, 25-45-15 Page 403 May 01/05
CES
Waste Chute Flap (Plastic) Figure 401A/TASK 25-45-15-991-001-A
R EFF : 004-049, 053-099, 101-149, 151-199, 201-299, 301-399, 401-499, 25-45-15 Page 404 Aug 01/05
CES
**ON A/C ALL
TASK 25-45-15-400-001
Installation of the Waste Chute Flap
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific Feeler Gauges
No specific Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft) No specific Torque Wrench : to 1.0 mm (0.03 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power
**ON A/C 001-049, 051-058, 101-101,
25-45-15-991-001 Fig. 401
R **ON A/C 004-049, 053-099, 101-149, 151-199, 201-299, 301-399, 401-499, Post SB 25-1226 For A/C 004-049,053-058,101-101, 25-45-15-991-001-A Fig. 401A
EFF : ALL
25-45-15Page 405
**ON A/C ALL
3. Job Set-up
__________
Subtask 25-45-15-860-050
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
4. Procedure
_________
Subtask 25-45-15-210-050
A. Preparation for Installation
(1)
Clean the component interface and/or the adjacent area.
(2)
Make sure that the parts retained from the removed component are clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area. R **ON A/C 001-049, 051-058, 101-101,
Subtask 25-45-15-420-050
B. Installation of the Waste Chute Flap
(Ref. Fig. 401/TASK 25-45-15-991-001)
(1)
Put the waste chute flap (1) in position and install the screws (4).
(2)
If fitted, connect the damper (5) to the waste chute flap (1).
(3)
Install the waste container (3) and close the access door (2).
(4)
Push the waste chute flap (1) and make sure it operates correctly.
EFF : ALL
25-45-15Page 406
R **ON A/C 004-049, 053-099, 101-149, 151-199, 201-299, 301-399, 401-499, Post SB 25-1226 For A/C 004-049,053-058,101-101, Subtask 25-45-15-420-050-A
B. Installation of the Waste Chute Flap (Plastic)
(Ref. Fig. 401A/TASK 25-45-15-991-001-A)
(1)
Get access from under the wash basin and put the waste chute flap (1) in position on the hinge (4).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备3(117)