(1)
Put the tape (1) in position and install the latch (2) with the screws (3).
(2)
Put the support (7) in position and install the screws (5) with the washers (6).
(3)
Put the baby nursing table (4) in position and install the screws (8) to secure the hinge to the lavatory rear wall.
EFF : ALL
25-45-25Page 408
**ON A/C ALL
Subtask 25-45-25-420-051
C. Installation of the Baby Nursing Table
(Ref. Fig. 402/TASK 25-45-25-991-002)
(1)
Put the latch (1) in position and install the screws (2).
(2)
Put the support (8) in position and install the screws (6) with the washers (7).
(3)
Put the baby nursing table (4) in position and install the screws (3) to secure the hinge to the lavatory rear wall.
R **ON A/C 001-049, 051-058, 101-101,
Subtask 25-45-25-710-050
D. Operational Test of the Baby Nursing Table (For Lavatory A only)
(1) Baby nursing table installed on the lavatory L/H side wall. (Ref. Fig. 401/TASK 25-45-25-991-001)
(a)
Open and close the baby nursing table (1) and make sure that the table locks correctly in the closed position, if necessary adjust as follows;
(b)
Loosen the screws (7).
(c)
Adjust the lacht (6) until the baby nursing table (1) locks correctly.
(d)
Tigten the screws (7).
EFF : ALL
25-45-25Page 409
R **ON A/C 059-099, 102-149, 151-199, 201-299, 301-399, 401-499,
Subtask 25-45-25-710-050-A
D. Operational Test of the Baby Nursing Table (For Lavatory A only)
(1) Baby nursing table installed on the lavatory rear wall (Ref. Fig. 401A/TASK 25-45-25-991-001-A)
(a)
Open and close the baby nursing table (4) and make sure that the table locks correctly in the closed position, if necessary adjust as follows;
(b)
Loosen the screws (3).
(c)
Adjust the latch (2) until the baby nursing table (4) locks correctly.
(d) Tigten the screws (3).
**ON A/C ALL
Subtask 25-45-25-710-051
E. Operational Test of the Baby Nursing Table
(1) Baby nursing table installed on the lavatory rear wall (Ref. Fig. 402/TASK 25-45-25-991-002)
(a)
Open and close the baby nursing table (4) and make sure that the table with the hook (5) locks correctly in the closed position, if necessary adjust as follows;
(b)
Loosen the screws (2).
(c)
Adjust the latch (1) until the baby nursing table (4) locks correctly.
(d)
Tigten the screws (2).
EFF : ALL
25-45-25Page 410
5. Close-up
________ Subtask 25-45-25-862-050
A. De-energize the ground service network (Ref. TASK 24-42-00-862-001).
EFF : ALL
25-45-25Page 411
LINING - REMOVAL/INSTALLATION
_____________________________
TASK 25-45-26-000-001
Removal of the Lining
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power R 25-45-38-000-001 Removal of the Wash Basin 25-45-26-991-001 Fig. 401
3. Job Set-up
__________
Subtask 25-45-26-861-050
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).
Subtask 25-45-26-010-050
B. Get Access R (1) Remove the wash basin assembly (Ref. TASK 25-45-38-000-001).
4. Procedure
_________
Subtask 25-45-26-020-050
A. Remove the Lining
(Ref. Fig. 401/TASK 25-45-26-991-001)
(1) Remove the screws (4), the washers (3) and if installed the spacers (2).
EFF : ALL
25-45-26Page 401
Lining
Figure 401/TASK 25-45-26-991-001
EFF : ALL 25-45-26 Page 402
Feb 01/98
CES
(2)
Remove the lining (1).
(3)
Remove the rollers (6), the screws (5) and the roller bracket (7).
EFF : ALL