__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 25-45-18-991-002 Fig. 402
3. Job Set-up
__________ Subtask 25-45-18-860-051
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized
(Ref. TASK 24-42-00-861-001).
4. Procedure
_________ Subtask 25-45-18-210-051
A. Preparation for Installation
(1)
Clean the component interface and/or the adjacent area.
(2)
Make sure that the parts retained from the removed component are clean and in the correct condition.
(3)
Do an inspection of the component interface and/or the adjacent area.
EFF : ALL
25-45-18Page 407
Subtask 25-45-18-420-051
B. Installation of the Access door Inside the Lavatory
(Ref. Fig. 402/TASK 25-45-18-991-002)
(1)
Install the bushes (3) and the door bolts (2) on the access door (4).
(2)
Put the support (1) on the upper door bolt (2).
(3)
Put the access door (4) in position and install the lower door bolt
(2) on the angle (6).
(4)
Position the support (1) and install the screws (8) and the washers (7).
(5) Close the access door (4). Subtask 25-45-18-710-051
C. Operational Test of the Access Door Inside the Lavatory
(Ref. Fig. 402/TASK 25-45-18-991-002)
(1) Open and close the access door (4) and make sure that the door locks correctly, if necessary adjust as follows;
(a)
Turn the door bolts (2) to adjust the position of the access door
(4) until the door locks correctly.
(b)
Close the access door (4).
5. Close-up
________ Subtask 25-45-18-862-051
A. De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
EFF : ALL
25-45-18Page 408
DOOR - LAVATORY - REMOVAL/INSTALLATION
______________________________________
TASK 25-45-19-000-001 Removal of the Lavatory Door
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
Power 25-45-19-991-001 Fig. 401 25-45-19-991-002 Fig. 402
3. Job Set-up
__________ Subtask 25-45-19-861-050
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).
4. Procedure
_________ Subtask 25-45-19-020-050
A. Removal of the Lavatory Bi-folding Door
(Ref. Fig. 401/TASK 25-45-19-991-001)
(1)
Release the door latches (5).
(2)
Open the lavatory bi-folding door (1).
(3)
Release the damper (2) from the lavatory wall bracket (3).
(4)
Loosen the screw (4) until you can slide it down to unlock the bi-folding door (1).
EFF : ALL
25-45-19Page 401
R Lavatory Bi-folding Door Figure 401/TASK 25-45-19-991-001
EFF : ALL 25-45-19 Page 402 Feb 01/05
CES
(5) Remove the bi-folding door (1).
Subtask 25-45-19-020-051
B. Removal of the Lavatory Single Blade Door (Ref. Fig. 402/TASK 25-45-19-991-002)
(1) Open the lavatory single blade door (1).
R R (2) Remove the screw (2) and the washer (6) and disconnect the door stop (3).
R R (3) Remove the screws (4) and the lavatory single blade door (1).
EFF : ALL
25-45-19Page 403
Lavatory Single Blade Door
Figure 402/TASK 25-45-19-991-002
EFF : ALL 25-45-19 Page 404
Feb 01/98
CES
TASK 25-45-19-400-001 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备3(121)