(Ref. Fig. 401/TASK 25-35-29-991-001)
(1)
Remove the blanking caps from the electrical connectors.
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Make sure that the electrical connectors are clean and in the correct condition.
(4)
Carefully push the refrigerator (4) into the galley.
(5) Tighten the screws (1). Subtask 25-35-29-865-052
B. Remove the safety clip(s) and tag(s), and close the related circuit
breaker(s).
Subtask 25-35-29-861-051
C. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002). Subtask 25-35-29-710-050
D. Do the operational test of the refrigerator (Ref. TASK 25-35-00-710-024).
5. Close-up
________ Subtask 25-35-29-410-050
A. Close-up
(1)
Install the related containers in the related galley.
(2)
Make sure that the work area is clean and clear of tool(s) and other items.
Subtask 25-35-29-862-050
B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
CONTROL PANEL - GALLEY - REMOVAL/INSTALLATION
_____________________________________________
TASK 25-35-34-000-001 Removal of the Galley Control-Panel
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
No specific circuit breaker(s) safety clip(s)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 25-35-34-991-001 Fig. 401
3. Job Set-up
__________ Subtask 25-35-34-861-050
A. Energize the Ground Service Network (Ref. TASK 24-42-00-861-001)
EFF : ALL
25-35-34Page 401
Subtask 25-35-34-865-050
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
**ON A/C 001-049, 051-060, 101-102, 201-201,
122VU ELEC/GALLEY/CTL **ON A/C ALL 1XA S26
R 122VU ELEC/GALLEY/CNTOR **ON A/C 061-099, 103-149, 151-199, 202-299, 301-399, 401-499, 7MC S28
122VU ELEC/GALY & CAB/CTL **ON A/C ALL 1XA S26
123VU FWD GALLEY/FEEDER F 123VU AFT GALLEY/FEEDER E **ON A/C 301-399, 16MC 14MC AC10AF09
R 123VU FWD GALLEY/FEEDER C 123VU FWD GALLEY/FEEDER D 1MC 2MC AE03AE02
R **ON A/C 301-399, 401-499,
R R 123VU AFT GALLEY/FEEDER A **ON A/C 401-499, 3MC AF04
R R R 123VU AFT GALLEY/FEEDER B 123VU FWD GALLEY/FEEDER D 123VU FWD GALLEY/FEEDER C 12MC 2MC 1MC AD09 AD04 AF09
EFF : ALL
25-35-34Page 402
Aug 01/05
R **ON A/C ALL
4. Procedure
_________
Subtask 25-35-34-020-050
A. Removal of the Galley Control-Panel
(Ref. Fig. 401/TASK 25-35-34-991-001)
(1)
Remove the screws (1).
(2)
Carefully pull the galley control-panel (2) out of the galley.
(3)
Disconnect the electrical connectors (3).
(4)
Remove the galley control-panel (2) from the galley.
(5)
Put blanking caps on the disconnected electrical connectors.
EFF : ALL
25-35-34Page 403
Galley Control-Panel Figure 401/TASK 25-35-34-991-001
R EFF : CES ALL 25-35-34 Page 404 May 01/04
TASK 25-35-34-400-001 Installation of the Galley Control-Panel
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment