(4)
Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-007) to the grubscrew (2).
Subtask 25-40-00-820-051
B. Adjustment of the Lavatory Single Blade Doors
(Ref. Fig. 201/TASK 25-40-00-991-008)
(1)
Open the lavatory door (6).
(2)
Loosen the screws (4).
(3)
Adjust the hinge (5) to get the dimension C clearance between the lavatory door (6) and the door frame.
(4)
Tighten the screws (4).
(5) Close the lavatory door (6). Subtask 25-40-00-710-050
C. Do the Operational Test of the Lavatory Doors
(Ref. Fig. 202/TASK 25-40-00-991-011)
(1) Emergency Opening (from outside of the lavatory). NOTE : For this test, the lavatory door must be locked from the
____
inside.
(a) Single Bladed Door 1 Lift up the spring loaded LAVATORY cover (1).
_
EFF : ALL
25-40-00Page 202
Adjustment of the Lavatory Doors
Figure 201/TASK 25-40-00-991-008
EFF : ALL 25-40-00 Page 203
Feb 01/98
CES
Lavatory Doors - Emergency Opening from the Outside
Figure 202/TASK 25-40-00-991-011
EFF : ALL 25-40-00 Page 204
Feb 01/98
CES
2_ Slide the knob (2) to the side until the indicator (4) shows
VACANT.
3_ Pull the lavatory door (3) open.
(b) Bi-folding Doors 1 Lift up the spring loaded LAVATORY cover (1).
_ 2 Slide the knob (2) to the side until the indicator (4) shows
_ VACANT.
3 Push the lavatory door (3) open and/or release the door
_ latches (5) and pull the lavatory door (3) fully open outwards.
(2) Do the Door Functional Test
(a)
Operate the lavatory door (3) and make sure that the door operation is correct.
(b)
Close the lavatory door (3), lock the door latches (5) and do the step (a) again.
5. Close-up
________ Subtask 25-40-00-862-051
A. De-energize the ground service network (Ref. TASK 24-41-00-862-002).
EFF : ALL
25-40-00Page 205
R **ON A/C 106-149, 211-299,
TASK 25-40-00-000-003
Opening of the Movable Wall Section of the Lavatory D before the
Installation/Removal of the Stretcher
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
Power
25-45-19-000-001 Removal of the Lavatory Door
25-40-00-991-010 Fig. 203
3. Job Set-up
__________
Subtask 25-40-00-861-051
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001).
4. Procedure
_________
Subtask 25-40-00-010-055
A. Preparation of the Lavatory D
(Ref. Fig. 203/TASK 25-40-00-991-010)
(1)
Remove the AFT lavatory folding-door (2) (Ref. TASK 25-45-19-000-001)
(2)
Remove the Protective Breathing Equipment (PBE) box (7).
(3)
Carefully pull the headrest (4) out off the cabin attendant seat (5).
Movable Wall Section Figure 203/TASK 25-40-00-991-010
R EFF : 106-149, 211-299, 25-40-00 Page 207 May 01/05
CES
Subtask 25-40-00-020-052
B. Open the Movable Wall of the AFT Lavatory
(Ref. Fig. 203/TASK 25-40-00-991-010)
(1) Release the latches (3) and open the movable wall (1).
TASK 25-40-00-400-002
Closing of the Movable Wall Section of the Lavatory D after the Installation/Removal of the Stretcher
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
11-00-00-400-010 Installation of the Decals 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备3(63)