 (f)
 Repair all leaks.

 (g)
 Turn the individual air outlet counterclockwise until it is in the open position.

 (h)
 Make sure that different airflow is possible when you turn the individual air outlet.

 

 (2)
 Do a check of the potable water- and waste water systems:

 (a)
 Pressurize the potable water system (Ref. TASK 38-10-00-614-001).

 (b)
 Examine all the potable water hoses for leaks.

 (c)
 Repair all leaks.

 (d)
 Operate the faucet and make sure that water flows.

 (e)
 Let the water flow until it is clean.

 (f)
 Examine the waste water hose for leaks.

 (g)
 Repair all leaks.

 (h)
 Depressurize the potable water system (Ref. TASK 38-10-00-614-002).

 

 (3)
 Do a check of the electrical system:

 (a)
 Push the pushbutton switch 2XA GALLEY on the overhead panel 35VU in the flight compartment.

 (b)
 Make sure that the POWER indicator light on the galley control panel comes on.

 (c)
 Make sure that all the circuit breakers on the galley control panel are closed.

 (d)
 Operate each electrical unit/component for a short time to make sure that it is serviceable.

 (e)
 For example, the galley worktoplight: 1 Push the worktoplight switch ON: the worktoplight goes ON.

 

 

 


_ 2 Push the worktoplight switch again "off": the worktoplight
_
 goes OFF.

 (f)
 Release the pushbutton switch 2XA GALLEY on the overhead panel 35VU in the flight compartment.

 (g)
 Make sure that the POWER indicator light on the galley control panel goes off.


 **ON A/C ALL
 5. Close-up
________ R **ON A/C 001-049, 101-105,
 Subtask 25-33-41-410-052
 A. Close Access
 (1)
 Close access to the Lower Connections
 (Ref. Fig. 402/TASK 25-33-41-991-006)


 (a) Put the panel (2) in position and install the screws (1).

 (2)
 Install the galley equipment.

 (3)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (4)
 Install the ceiling panels (Ref. TASK 25-23-41-400-001) and the door frame linings (Ref. TASK 25-23-45-400-005) and (Ref. TASK 25-23-45-400-008) in the area of the galley.

 (5)
 Install the curtain rail and curtain, if removed (Ref. TASK 25-26-41-400-003).


 EFF : ALL
25-33-41Page 492


R  **ON A/C 051-099, 
R  Subtask 25-33-41-410-052-C 
R  A. Close Access 
R R  (1) Make sure that the work area is clean and clear of tool(s) and other items. 
R R  (2) Close access to the Lower Connections (Ref. Fig. 402A/TASK 25-33-41-991-006-C) 
R  (a) Put the panel (1) in position and install the screws (2). 
R  (3) Install the galley equipment. 
R R R  (4) Install the ceiling panels (Ref. TASK 25-23-41-400-001) and the door frame linings (Ref. TASK 25-23-45-400-005) and (Ref. TASK 25-23-45-400-008) in the area of the galley. 
R R  (5) Install the curtain rail and curtain, if removed (Ref. TASK 25-26-41-400-003). 
R  **ON A/C 106-149, 201-299,
 Subtask 25-33-41-410-052-A
 A. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.
 (2) Install the galley equipment.
 (a) Install the ovens (Ref. TASK 25-35-19-400-001).
 (b) Install the water heaters (Ref. TASK 25-35-27-400-001).
 (c) Install the coffee maker (Ref. TASK 25-35-15-400-001).
 (d) Install the galley trolleys.
 (3) Install the ceiling panels (Ref. TASK 25-23-41-400-001) and the door frame linings (Ref. TASK 25-23-45-400-005) and (Ref. TASK 25-23-45-400-008) in the area of the galley.

 CES  EFF : ALL


 (4) Install the curtain rail and curtain, if removed (Ref. TASK 25-26-41-
400-003). 
R  **ON A/C 151-199, 
R  Subtask 25-33-41-410-052-B 
R  A. Close Access 
R  (1) Make sure that the work area is clean and clear of tool(s) and other
 items. 
R  (2) Install the galley equipment: 
R  (a) Install the ovens (Ref. TASK 25-35-19-400-001). 
R  (b) Install the coffee maker (Ref. TASK 25-35-15-400-001). 
R  (c) Install the water boilers (Ref. TASK 25-35-27-400-001). 
 