-------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
-Release the brew handle to the up position.
-Open the coffee-maker hot water-faucet.
-Close the coffee-maker hot water-faucet.
-
If installed, open the coffee-maker cold water-faucet.
-
If installed, close the coffee-maker cold water-faucet.
-Lock the brew handle in the down position and push the BREW pushbutton switch.
-Remove the coffee-server and discard the contents.
-Put the coffee-server in position under the coffee-maker hot water-faucet.
-Open and hold the coffee-maker hot water-faucet in the open position.
-If the water has the set temperature, the hot water flows through the brew-cup into the coffee-server.
-The indicator in the BREW pushbuttongoes off, and the hot water flow through the brew-cup stops.
-Hot water flows from the coffee-makerhot water-faucet.
-The hotwater flow stops.
-
If installed, cold water flows fromthe coffee-maker cold water-faucet.
-
If installed, the cold water flowstops.
-The indicator in the BREW pushbuttoncomes on.
-
After a short time the hot water flows through the brew-cup into the coffee-server.
-
After approx. 3 minutes the water has the set level in the coffee-server and operates the level sensor.
-The water flow stops and the indicator in the BREW pushbutton goes off.
-Hot water flows from the coffee-makerhot water-faucet.
R EFF : 106-149, 151-199, 201-299, 301-399, 25-35-00Page 506 401-499, Aug 01/05
CES
-------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
-Close the coffee-maker hot - The hotwater flow from the water-faucet. coffee-maker hot water-faucet stops.
-Push the ON/OFF pushbutton. - The indicator in the ON/OFF pushbutton and in the HOT PLATE ON pushbutton goes off.
R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,
5. Close-up
________
Subtask 25-35-00-410-051
A. Close Access
(1)
Put all related CB and switches to their initial configuration.
(2)
Make sure that the coffee-maker is in its initial configuration.
(3)
Depressurize the potable water system (Ref. TASK 38-10-00-614-002).
(4)
Make sure that the work area is clean and clear of tool(s) and other items.
Subtask 25-35-00-862-062
B. De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
R EFF : 001-049, 101-149, 151-199, 201-299, 25-35-00Page 507 301-399, 401-499, Aug 01/05
CES R **ON A/C ALL
TASK 25-35-00-710-015
Operational Test of the Oven
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 24-56-00-710-001 Operational Test of the Galley Supply
3. Job Set-up
__________
Subtask 25-35-00-861-064
A. Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
Subtask 25-35-00-860-053
B. Aircraft Maintenance Configuration
(1)
Make sure that the related galley is supplied with electrical power (Ref. TASK 24-56-00-710-001).
(2)
Make sure that the related circuit breaker(s) of the oven on the galley control panel is(are) closed.
(3)
Make sure that the door of the oven is closed.
EFF : ALL
25-35-00Page 508
4. Procedure
_________ R **ON A/C 001-049, 101-105,
Subtask 25-35-00-710-066-B
A. Do the Operational Test of the Oven
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备3(41)