• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:27来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

At the coffee-maker:
-After a short time, the light in theNO WATER or LOW WATER indicator goesoff.
-The indicators in the BREW and HOTPLATE ON pushbuttons comes on.
R  EFF : 106-149, 151-199, 201-299, 301-399, 25-35-00Page 505 401-499, Aug 01/05
 CES


 -------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
-Release the brew handle to the up position.
-Open the coffee-maker hot water-faucet.
-Close the coffee-maker hot water-faucet.
 -
If installed, open the coffee-maker cold water-faucet.

-
If installed, close the coffee-maker cold water-faucet.


-Lock the brew handle in the down position and push the BREW pushbutton switch.
 -Remove the coffee-server and discard the contents.
 -Put the coffee-server in position under the coffee-maker hot water-faucet.
 -Open and hold the coffee-maker hot water-faucet in the open position.
-If the water has the set temperature, the hot water flows through the brew-cup into the coffee-server.
-The indicator in the BREW pushbuttongoes off, and the hot water flow through the brew-cup stops.
-Hot water flows from the coffee-makerhot water-faucet.
-The hotwater flow stops.
-
If installed, cold water flows fromthe coffee-maker cold water-faucet.

-
If installed, the cold water flowstops.


-The indicator in the BREW pushbuttoncomes on.
 -
After a short time the hot water flows through the brew-cup into the coffee-server.

 -
After approx. 3 minutes the water has the set level in the coffee-server and operates the level sensor.


 -The water flow stops and the indicator in the BREW pushbutton goes off.
-Hot water flows from the coffee-makerhot water-faucet.
R  EFF : 106-149, 151-199, 201-299, 301-399, 25-35-00Page 506 401-499, Aug 01/05
 CES


 -------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
-Close the coffee-maker hot  - The hotwater flow from the water-faucet. coffee-maker hot water-faucet stops.
 -Push the ON/OFF pushbutton.  - The indicator in the ON/OFF pushbutton and in the HOT PLATE ON pushbutton goes off.
R  **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,
 5. Close-up
________
 Subtask 25-35-00-410-051

 A. Close Access
 (1)
 Put all related CB and switches to their initial configuration.

 (2)
 Make sure that the coffee-maker is in its initial configuration.

 (3)
 Depressurize the potable water system (Ref. TASK 38-10-00-614-002).

 (4)
 Make sure that the work area is clean and clear of tool(s) and other items.


 Subtask 25-35-00-862-062
 B. De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).

R  EFF : 001-049, 101-149, 151-199, 201-299, 25-35-00Page 507 301-399, 401-499, Aug 01/05
 CES R **ON A/C ALL


 TASK 25-35-00-710-015
 Operational Test of the Oven

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 24-56-00-710-001 Operational Test of the Galley Supply
 3. Job Set-up
__________
 Subtask 25-35-00-861-064

 A. Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002).

 Subtask 25-35-00-860-053
 B. Aircraft Maintenance Configuration
 (1)
 Make sure that the related galley is supplied with electrical power (Ref. TASK 24-56-00-710-001).

 (2)
 Make sure that the related circuit breaker(s) of the oven on the galley control panel is(are) closed.

 (3)
 Make sure that the door of the oven is closed.


 EFF : ALL
25-35-00Page 508


 4. Procedure
_________ R **ON A/C 001-049, 101-105,
 Subtask 25-35-00-710-066-B
 A. Do the Operational Test of the Oven
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备3(41)