• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:27来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 5. Close-up
________ Subtask 25-35-00-410-058
 A. Close Access
 (1)
 Put all related CB and switches to their initial configuration.

 (2)
 Make sure that the hot-cup is in its initial configuration.

 (3)
 Make sure that the work area is clean and clear of tool(s) and other items.


 Subtask 25-35-00-862-069
 B. De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).

 

 TASK 25-35-00-710-021
 Operational Test of the Hot-Jug
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power
 3. Job Set-up
__________
 Subtask 25-35-00-861-070

 A. Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002).

 Subtask 25-35-00-865-075
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------
PANEL DESIGNATION  IDENT. LOCATION
 -------------------------------------------------------------------------------
122VU ELEC/GALLEY/CNTOR  7MC S28
R **ON A/C 001-049, 101-102,
 122VU ELEC/GALLEY/CTL 1XA S26 R **ON A/C 103-105,
 122VU ELEC/GALY & CAB/CTL  1XA S26


R  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C 001-049, 101-105, 
R RR 123VU FWD GALLEY/FEEDER F 123VU AFT GALLEY/FEEDER E  16MC 14MC  AC10 AF09 
Subtask 25-35-00-860-059
 C. Aircraft Maintenance Configuration
 (1) Make sure that the pushbutton GALLEY 2XA on the overhead panel 35VU is in the ON position (the white OFF indicator does not come on).
 (2) Make sure that the related CB of the hot-jug on the galley control panel is closed.
 4. Procedure_________
 Subtask 25-35-00-710-072-A
 A. Do the Operational Test of the Hot-Jug
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------

1. At the galley:  On the hot-jug:
 - Fill the hot-jug with water and  - The water becomes warm after some
 move it carefully into the  minutes.
 related galley compartment.
 5. Close-up________
 Subtask 25-35-00-410-059
 A. Close Access

 (1)
 Put all related CB and switches to their initial configuration.

 (2)
 Make sure that the hot-jug is in its initial configuration.

 (3)
 Make sure that the work area is clean and clear of tool(s) and other

 

 

 items. Subtask 25-35-00-862-070
 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).


R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299,
 TASK 25-35-00-710-023
 Operational Test of the Water-Heater/Boiler

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R No specific 1 CONTAINER 5 L(1 1/2 USGAL)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 38-10-00-614-001 Pressurization of the Potable Water System from a Ground Air Supply 38-10-00-614-002 Depressurization of the Potable Water System
 3. Job Set-up
__________
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备3(46)