(2)
Make sure that the hot-cup is in its initial configuration.
(3)
Make sure that the work area is clean and clear of tool(s) and other items.
Subtask 25-35-00-862-069
B. De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
TASK 25-35-00-710-021
Operational Test of the Hot-Jug
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power
3. Job Set-up
__________
Subtask 25-35-00-861-070
A. Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
Subtask 25-35-00-865-075
B. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU ELEC/GALLEY/CNTOR 7MC S28
R **ON A/C 001-049, 101-102,
122VU ELEC/GALLEY/CTL 1XA S26 R **ON A/C 103-105,
122VU ELEC/GALY & CAB/CTL 1XA S26
R -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C 001-049, 101-105,
R RR 123VU FWD GALLEY/FEEDER F 123VU AFT GALLEY/FEEDER E 16MC 14MC AC10 AF09
Subtask 25-35-00-860-059
C. Aircraft Maintenance Configuration
(1) Make sure that the pushbutton GALLEY 2XA on the overhead panel 35VU is in the ON position (the white OFF indicator does not come on).
(2) Make sure that the related CB of the hot-jug on the galley control panel is closed.
4. Procedure_________
Subtask 25-35-00-710-072-A
A. Do the Operational Test of the Hot-Jug
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. At the galley: On the hot-jug:
- Fill the hot-jug with water and - The water becomes warm after some
move it carefully into the minutes.
related galley compartment.
5. Close-up________
Subtask 25-35-00-410-059
A. Close Access
(1)
Put all related CB and switches to their initial configuration.
(2)
Make sure that the hot-jug is in its initial configuration.
(3)
Make sure that the work area is clean and clear of tool(s) and other
items. Subtask 25-35-00-862-070
B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299,
TASK 25-35-00-710-023
Operational Test of the Water-Heater/Boiler
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R No specific 1 CONTAINER 5 L(1 1/2 USGAL)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 38-10-00-614-001 Pressurization of the Potable Water System from a Ground Air Supply 38-10-00-614-002 Depressurization of the Potable Water System
3. Job Set-up
__________
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备3(46)