TASK 25-45-26-400-001
Installation of the Lining
1. Reason for the Job__________________
Self Explanatory
2. Job Set-up Information______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R R 24-42-00-861-001 24-42-00-862-001 25-45-38-000-001 25-45-38-400-001 25-45-26-991-001 Energize the Ground Service Network from the External PowerDe-energize the Ground Service Network Supplied from the External Power Removal of the Wash Basin Installation of the Wash Basin Fig. 401
3. Job Set-up__________
Subtask 25-45-26-860-050
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
R R (2) Make sure that the wash basin assembly is removed (Ref. TASK 25-45-38-000-001).
4. Procedure_________
Subtask 25-45-26-210-050
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area.
(2) Make sure that the parts retained from the removed component are clean and in the correct condition.
EFF : ALL
25-45-26Page 404
(3) Do an inspection of the component interface and/or the adjacent area. Subtask 25-45-26-420-050
B. Installation of the Lining
(Ref. Fig. 401/TASK 25-45-26-991-001)
(1)
Put the roller bracket (7) on the lining (1) and install the screws (5).
(2)
Put the lining (1) in position and install the screws (4), washers
(3) and if removed the spacers (2).
(3)
Install the rollers (6) on the roller bracket (7).
5. Close-up
________
Subtask 25-45-26-410-050
A. Close Access
R (1) Install the wash basin assembly (Ref. TASK 25-45-38-400-001). Subtask 25-45-26-862-050
B. De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
EFF : ALL
25-45-26Page 405
MICROSWITCH - DOOR - REMOVAL/INSTALLATION
_________________________________________
TASK 25-45-33-000-001 Removal of the Door Microswitch
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps No specific circuit breaker(s) safety clip(s) No specific M15. 570-22
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 25-45-33-991-001 Fig. 401
3. Job Set-up
__________ Subtask 25-45-33-861-050
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).
EFF : ALL
25-45-33Page 401
**ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
Subtask 25-45-33-865-050
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LIGHT - LAV 1LQ J01
2000VU LAV FWD & MID - OCCUPIED 1WJ F01
2001VU LAVATORY AFT OCCUPIED 11WJ B04
R **ON A/C 151-199, 401-499,
Subtask 25-45-33-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAV LIGHT 1LQ C01
2000VU LAVATORY FWD & MID OCCUPIED 1WJ C06
2001VU LAVATORY AFT OCCUPIED 11WJ E07
**ON A/C ALL
4. Procedure
_________
Subtask 25-45-33-020-050
A. Removal of the Door Microswitch
(Ref. Fig. 401/TASK 25-45-33-991-001)
(1)
Open the lavatory door (1) to gain access to the door microswitch (4).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备3(130)