4. Procedure
_________ Subtask 25-45-17-020-050
A. Removal of the Waste Box
(Ref. Fig. 401/TASK 25-45-17-991-001)
(1)
If necessary, open the access door (2) on the lavatory front wall.
(2)
Open the access door (1) inside the lavatory and if necessary remove it (Ref. TASK 25-45-18-000-002).
(3)
Remove the waste container (7).
EFF : ALL
25-45-17Page 401
Waste Box
Figure 401/TASK 25-45-17-991-001
EFF : ALL 25-45-17 Page 402
Feb 01/98
CES
(4)
Remove the fire extinguisher (11) (Ref. TASK 26-25-00-600-002).
(5)
Remove the screws (4), the washers (5), the nuts (6) and the waste chute (3).
(6)
Remove the screws (8), the washers (9) and the waste container console (10).
EFF : ALL
25-45-17Page 403
TASK 25-45-17-400-001 Installation of the Waste Box
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power 25-45-18-400-002 Installation of the Access Door Inside the Lavatory 26-25-00-600-002 Weight Check of the Lavatory Fire-Extinguisher
Bottles 25-45-17-991-001 Fig. 401
3. Job Set-up
__________ Subtask 25-45-17-860-050
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized
(Ref. TASK 24-42-00-861-001).
4. Procedure
_________ Subtask 25-45-17-210-050
A. Preparation for Installation
(1)
Clean the component interface and/or the adjacent area.
(2)
Make sure that the parts retained from the removed component are clean and in the correct condition.
(3)
Do an inspection of the component interface and/or the adjacent area.
EFF : ALL
25-45-17Page 404
Subtask 25-45-17-420-050
B. Installation of the Waste Box
(Ref. Fig. 401/TASK 25-45-17-991-001)
(1)
Put the waste container console (10) in position and install the screws (8) and the washers (9).
(2)
Put the waste chute (3) on the waste container console (10) and install the screws (4), the washers (5) and the nuts (6).
(3)
Install the fire extinguisher (11) (Ref. TASK 26-25-00-600-002).
(4)
Install the waste container (7).
(5)
If necessary, close the access door (2) on the lavatory front wall.
(6)
Install the access door (1) inside the lavatory if removed (Ref. TASK 25-45-18-400-002).
5. Close-up
________ Subtask 25-45-17-862-050
A. De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
EFF : ALL
25-45-17Page 405
ACCESS DOOR - REMOVAL/INSTALLATION
__________________________________
TASK 25-45-18-000-001 Removal of the Access Door on the Lavatory Front Wall
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 25-45-18-991-001 Fig. 401
3. Job Set-up
__________ Subtask 25-45-18-861-050
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备3(119)