R  5. Close-up________ 
R  Subtask 25-40-00-410-050 
R  A. Close Access 
R  (Ref. Fig. 601/TASK 25-40-00-991-001-A) 
R  (1) Make sure that the work area is clean and clear of tool(s) and other 
R  items. 
R  (2) Install the waste container. 
R  (3) Close the waste container access-door. 
R  (4) Close the lavatory door.

 EFF : ALL
25-40-00Page 603
Feb 01/05


 TASK 25-40-00-210-002 R Detailed Inspection of the Lavatory Attachment Points
 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: 254000-02


 2.
 Job Set-up Information


______________________
R A. Fixtures, Tools, Test and Support Equipment
R -------------------------------------------------------------------------------R REFERENCE QTY DESIGNATION R -------------------------------------------------------------------------------
R No specific 1 LIGHT SOURCE - INSPECTION R No specific 1 MIRROR - INSPECTION
R B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R 24-42-00-861-001
R
R 24-42-00-862-001
R
R 25-23-42-000-001 25-23-42-000-002 25-23-42-400-001
25-23-42-400-002 25-23-45-000-005
25-23-45-400-006
R 35-21-41-000-001 35-21-41-400-001 51-76-11-300-001
R 25-40-00-991-002 Energize the Ground Service Network from the External Power De-energize the Ground Service Network Supplied from the External Power
Removal of the Ceiling Panels - Forward Utility AreaRemoval of the Ceiling Panels - Aft Utility AreaInstallation of the Ceiling Panels - Forward Utility AreaInstallation of the Ceiling Panels - Aft Utility AreaRemoval of the Door Frame Linings at the Left FWD Passenger/Crew DoorInstallation of the Door Frame Linings at the Left FWD Passenger/Crew Door
Removal of the Emergency Oxygen ContainersInstallation of the Emergency Oxygen ContainersRepair of the Sealing Fig. 602
 EFF : ALL
25-40-00Page 604
Feb 01/05


 3. Job Set-up__________ 
R  Subtask 25-40-00-861-054 
R R  A. Energize the ground service network (Ref. TASK 24-42-00-861-001).
 Subtask 25-40-00-010-052 
R  B. Get Access
 (1) For the FWD lavatory.
 (a) Remove the ceiling panel 221AC in the forward utility area (Ref. TASK 25-23-42-000-001).
 (b) Remove the door-frame lining panel 221EW (Ref. TASK 25-23-45-000-005).
R  (c) Open the oxygen service panel in the lavatory (Ref. TASK 35-21-41-000-001). 
R  (d) Open the flap of the stowage of the cabin attendant seat (CAS). 
R R R  (e) Remove the emergency equipment from the stowage of the CAS as necessary. 
R R  (f) Remove the cover from the wall fitting on the lavatory passage wall.
 **ON A/C 301-399,
 Subtask 25-40-00-010-054 
R  C. For the MID lavatory.
 (1) Remove the covers from the lower attachment points.
 (2) Remove the access flap on the lavatory rearwall.

 EFF : ALL
25-40-00Page 605
Feb 01/05


 **ON A/C ALL
 Subtask 25-40-00-010-053 
R  D. Get Access
 (1) For the AFT lavatories. 
R  (a) Open the flap of the stowage of the cabin attendant seat (CAS). 
R R R  (b) Remove the emergency equipment from the stowage of the CAS as necessary. 
R R (c) Remove the ceiling panels 261CC, 261BC in the aft utility area (Ref. TASK 25-23-42-000-002). 
(d) Remove the covers from the lower attachment points as necessary.
 4. Procedure_________
 Subtask 25-40-00-210-051
R  A. Visual Inspection of the Lavatory Attachment Points. (Ref. Fig. 602/TASK 25-40-00-991-002) 
R R  NOTE : You will need a MIRROR - INSPECTION and a LIGHT SOURCE -____ INSPECTION for the inspection procedure.
 (1) Visually examine the upper attachment points and the brace assemblies for: - correct installation, - corrosion, - cracks, - contamination, - installation of the quick release pins, - safety of the locknuts.
 (2) Visually examine the lower attachment points for: - cracks, - corrosion, - correct installation, - contamination.

 EFF : ALL
25-40-00Page 606
Feb 01/05


R  Lavatory Attachment Points Figure 602/TASK 25-40-00-991-002
 EFF :  ALL  25-40-00 Page 607 Feb 01/05
 CES 

 

R  (3) Make sure that the sealing is in good condition. 
 