 EFF : ALL
25-40-00Page 212
May 01/04
R
 CES


 Shim - Lavatory Installation (Hardpoint Attachment) Figure 204/TASK 25-40-00-991-012
R  EFF : CES  ALL  25-40-00 Page 213 May 01/04 

 

 Shim - Lavatory Installation (Seat Rail Attachment) Figure 205/TASK 25-40-00-991-013
R  EFF : CES  ALL  25-40-00 Page 214 May 01/04 

 

 Shim Installation Figure 206/TASK 25-40-00-991-014 
R  EFF :  ALL  25-40-00 Page 215 May 01/04
 CES 

 

 (d) Install the applicable shim plates (3) to make the lavatory floor level (Refer to Section B-B).
 NOTE : The maximum step from each shim plate must not be more
____
 than 0.5 mm (0.02 in.).

 (4)
 Put the lavatory assembly in position.

 (5)
 Do Step (3) again.

 (6)
 Remove the applicable lavatory assembly.

 (7)
 Note the shims installed at each location and remove the shims plates

 (2) and (3).

 (8)
 Install the BONDING AND ADHESIVE COMPOUNDS (Material No. 08-082) (4) to the aircraft floor structure.

 (9)
 Install the applicable shim plates (2) with BONDING AND ADHESIVE COMPOUNDS (Material No. 08-082) between each shim plate.


 NOTE : The maximum step from each shim plate must not be more than
____ 0.5 mm (0.02 in.).
 (10) Install the applicable shim plates (3) with BONDING AND ADHESIVE COMPOUNDS (Material No. 08-082) between each shim plate.
 NOTE : The maximum step from each shim plate must not be more than
____ 0.5 mm (0.02 in.).
 (11) Put the applicable lavatory assembly in position and make sure it is vertical to the aircraft floor structure.
 5. Close-up
________ Subtask 25-40-00-862-054
 A. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 

 LAVATORIES - INSPECTION/CHECK_____________________________ 
R  TASK 25-40-00-210-001 
R  Detailed Inspection of the Waste Compartment Including Waste Flap and 
R  Operational Check of Waste Flap 
R  1. Reason for the Job__________________ 
R  Refer to the MPD TASK: 254000-01 
R  2. Job Set-up Information______________________ 
R  A. Fixtures, Tools, Test and Support Equipment 
R  -------------------------------------------------------------------------------
R  REFERENCE QTY DESIGNATION 
R  -------------------------------------------------------------------------------
R  No specific 1 LIGHT SOURCE - INSPECTION 
R  No specific 1 MIRROR - INSPECTION 
R  B. Referenced Information 
R  -------------------------------------------------------------------------------
R  REFERENCE DESIGNATION 
R  -------------------------------------------------------------------------------
R  25-40-00-991-001-A Fig. 601 
R  3. Job Set-up__________ 
R  Subtask 25-40-00-010-050 
R  A. Get Access 
R  (Ref. Fig. 601/TASK 25-40-00-991-001-A) 
R  (1) Open the applicable lavatory door. 
R  (2) Open the waste container access-door. 
R  (3) Remove and clean the waste container.

 EFF : ALL
25-40-00Page 601
Feb 01/05


R R  Lavatory Waste Container and Waste Chute with Flap Figure 601/TASK 25-40-00-991-001-A
 EFF :  ALL  25-40-00 Page 602 Feb 01/05
 CES 

 

R  4. Procedure_________ 
R  Subtask 25-40-00-210-050 
R  A. Detailed Inspection of the Waste Compartment, the Waste Flap and 
R  Operational Check of the Waste Flap 
R  (Ref. Fig. 601/TASK 25-40-00-991-001-A) 
R  (1) Visually examine the waste container compartment, the waste container 
R  and the waste flap for: 
R  - distortion, 
R  - cracks, 
R  - corrosion, 
R  - signs of fire damage, 
R  - contamination. 
R  (2) With a MIRROR - INSPECTION and a LIGHT SOURCE - INSPECTION, visually 
R  examine the waste chute for: 
R  - distortion, 
R  - corrosion, 
R  - signs of fire damage, 
R  - contamination. 
R  (3) Operate the waste flap to make sure that the waste flap closes and 
R  seals correctly. 
 