• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:24来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 
R  E. Do the Test of the Restraint System.
 NOTE : Do this test if no inertia reel is installed.____
 (1) Make sure that the buckle locks/unlocks correctly. 
R R (2) Make sure that you can adjust the length of the belt assy correctly. 
5. Close-up________
 Subtask 25-22-42-410-053
 A. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.

 EFF : ALL

25-22-42Page 415
Feb 01/99


 Subtask 25-22-42-862-052
 B. De-energize the ground service network (Ref. TASK 24-42-00-862-001).
 EFF : ALL

25-22-42Page 416


 SEAT - CABIN ATTENDANT SWIVEL - REMOVAL/INSTALLATION____________________________________________________ 
R  TASK 25-22-43-000-001 
R  Removal of the Cabin Attendant Swivel-Seat 
R  1. Reason for the Job__________________ 
R  Self Explanatory 
R  2. Job Set-up Information______________________ 
R  A. Fixtures, Tools, Test and Support Equipment 
R  -------------------------------------------------------------------------------
R  REFERENCE QTY DESIGNATION 
R  -------------------------------------------------------------------------------
R  No specific blanking caps 
R  No specific circuit breaker(s) safety clip(s) 
R  No specific nonmetallic scraper 
R  B. Referenced Information 
R  -------------------------------------------------------------------------------
R  REFERENCE DESIGNATION 
R  -------------------------------------------------------------------------------
R  24-42-00-861-001 Energize the Ground Service Network from the External 
R  Power 
R  25-22-43-991-001 Fig. 401 
R  3. Job Set-up__________ 
R  Subtask 25-22-43-861-052 
R  A. Energize the ground service network 
R  (Ref. TASK 24-42-00-861-001).

 EFF : ALL

25-22-43Page 401
May 01/99


 Subtask 25-22-43-865-050
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-399,
 49VU COM/CIDS/DEU B/ESS 153RH G03 **ON A/C 001-049, 051-099, 101-105, 201-299,
 121VU COM NAV/CIDS/DEU B/NORM 162RH M07 R **ON A/C 106-149, 151-199, 401-499,
 121VU COM NAV/CIDS/DEU B/NORM 162RH M08 **ON A/C ALL
 Subtask 25-22-43-010-053
 C. Remove all of the equipment from the stowage compartment in the swivel seat to get access to the seat attachment bolts.
 4. Procedure
_________
 Subtask 25-22-43-020-050

 A. Removal the Seat Assembly
 (Ref. Fig. 401/TASK 25-22-43-991-001)

 (1)
 Get and pull the end of the synthetic cord to loosen the sealant between the seat and the floor.

 (2)
 Open the door (6).

 (3)
 Disconnect the electrical connector (8).

 (4)
 Put blanking caps on the disconnected electrical connectors.

 (5)
 Remove the bolts (5) and the washers (4).

 (6)
 Remove the seat assembly (1).


 EFF : ALL

25-22-43Page 402


R  Cabin Attendant Swivel-Seat Figure 401/TASK 25-22-43-991-001
 EFF :  ALL  25-22-43 Page 403 Feb 01/02
 CES 

 

 (7)
 Remove and discard the packings (3).

 (8)
 Remove the bushes (2).

 (9)
 Remove the old sealant from the floor with a nonmetallic scraper.


 EFF : ALL

25-22-43Page 404
May 01/03
R
 CES  TASK 25-22-43-000-005 Removal of the Restraint System


 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
 Power 25-22-43-991-006 Fig. 402 25-22-43-991-007 Fig. 403
 3. Job Set-up
__________ Subtask 25-22-43-861-053
 A. Aircraft Maintenance Configuration
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2