 Subtask 25-44-00-865-051
 C. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
 -------------------------------------------------------------------------------
2000VU LAV LIGHT 1LQ 01 C
 OR
 2000VU TOILET LIGHT 1LQ 01 C
 EFF : ALL
25-44-00Page 502


 **ON A/C ALL
 4. Procedure
_________ R **ON A/C 001-049, 051-099, 101-105, 151-152, 201-206,
 Subtask 25-44-00-710-050
 A. Operational Test of the Razor Supply System
 (1) Do the test:
 NOTE : The test is the same for all lavatories

____
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
In the related lavatory: At the razor outlet:
 -connect a MULTIMETER - STANDARD to - the multimeter shows 110+15-5 VAC, the razor outlet. 60Hz
 (2) Disconnect the multimeter from the razor outlet. R **ON A/C ALL
 5. Close-up
________ R **ON A/C 001-049, 051-099, 101-105, 151-152, 201-206,
 Subtask 25-44-00-862-050
 A. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001)

 EFF : ALL
25-44-00Page 503


 STATIC INVERTER - REMOVAL/INSTALLATION
______________________________________
 TASK 25-44-41-000-001
 Removal af the Static Inverter - Razor Supply
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)

 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 25-23-42-000-002 Removal of the Ceiling Panels - Aft Utility Area
 **ON A/C 001-049, 051-099, 101-105, 151-152, 201-206,
 25-44-41-991-001 Fig. 401 R **ON A/C 106-149, 153-199, 207-299, 301-399, 401-499,
 25-44-41-991-001-A Fig. 401A
 EFF : ALL
25-44-41Page 401


 **ON A/C ALL
 3. Job Set-up
__________
 Subtask 25-44-41-861-050

 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

 **ON A/C 001-049, 051-099, 101-105, 151-152, 201-206,
 Subtask 25-44-41-010-050
 B. Get Access
 (1) Remove the ceiling panel 261CC (Ref. TASK 25-23-42-000-002).
 Subtask 25-44-41-865-050

 C. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------2001VU LAV SHAVER SOCKET 1MT 01 E OR 2001VU LAV SHAVER SOCKET 1MT 01 C
R **ON A/C 106-149, 153-199, 207-299, 301-399, 401-499,
 Subtask 25-44-41-865-051
 D. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------2000VU LAV LIGHT 1LQ 01 C OR 2000VU TOILET LIGHT 1LQ 01 C
 EFF : ALL
25-44-41Page 402


 **ON A/C ALL
 4. Procedure
_________
 **ON A/C 001-049, 051-099, 101-105, 151-152, 201-206,

 Subtask 25-44-41-020-050
 A. Removal of the Static Inverter 2MT
 (Ref. Fig. 401/TASK 25-44-41-991-001)

 (1)
 Disconnect the electrical connector (4)

 (2)
 Put blanking caps on the disconnected electrical connectors.


 (3) Remove the screws (2), the washers (1) and the static inverter (3). R **ON A/C 106-149, 153-199, 207-299, 301-399, 401-499,
 Subtask 25-44-41-020-050-A
 A. Removal of the Mini Inverter 10MT
 (Ref. Fig. 401A/TASK 25-44-41-991-001-A)

 (1)
 Remove the screws (2) and the washers (3) and carefully lower the housing (1).

 (2)
 Unlock the spring latches (4) and disconnect the electrical connector
 