**ON A/C ALL
4. Procedure
_________ R **ON A/C 001-049, 051-099, 101-105, 151-152, 201-206,
Subtask 25-44-00-710-050
A. Operational Test of the Razor Supply System
(1) Do the test:
NOTE : The test is the same for all lavatories
____
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
In the related lavatory: At the razor outlet:
-connect a MULTIMETER - STANDARD to - the multimeter shows 110+15-5 VAC, the razor outlet. 60Hz
(2) Disconnect the multimeter from the razor outlet. R **ON A/C ALL
5. Close-up
________ R **ON A/C 001-049, 051-099, 101-105, 151-152, 201-206,
Subtask 25-44-00-862-050
A. De-energize the ground service network
(Ref. TASK 24-42-00-862-001)
EFF : ALL
25-44-00Page 503
STATIC INVERTER - REMOVAL/INSTALLATION
______________________________________
TASK 25-44-41-000-001
Removal af the Static Inverter - Razor Supply
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific blanking caps
No specific circuit breaker(s) safety clip(s)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 25-23-42-000-002 Removal of the Ceiling Panels - Aft Utility Area
**ON A/C 001-049, 051-099, 101-105, 151-152, 201-206,
25-44-41-991-001 Fig. 401 R **ON A/C 106-149, 153-199, 207-299, 301-399, 401-499,
25-44-41-991-001-A Fig. 401A
EFF : ALL
25-44-41Page 401
**ON A/C ALL
3. Job Set-up
__________
Subtask 25-44-41-861-050
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001).
**ON A/C 001-049, 051-099, 101-105, 151-152, 201-206,
Subtask 25-44-41-010-050
B. Get Access
(1) Remove the ceiling panel 261CC (Ref. TASK 25-23-42-000-002).
Subtask 25-44-41-865-050
C. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------2001VU LAV SHAVER SOCKET 1MT 01 E OR 2001VU LAV SHAVER SOCKET 1MT 01 C
R **ON A/C 106-149, 153-199, 207-299, 301-399, 401-499,
Subtask 25-44-41-865-051
D. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------2000VU LAV LIGHT 1LQ 01 C OR 2000VU TOILET LIGHT 1LQ 01 C
EFF : ALL
25-44-41Page 402
**ON A/C ALL
4. Procedure
_________
**ON A/C 001-049, 051-099, 101-105, 151-152, 201-206,
Subtask 25-44-41-020-050
A. Removal of the Static Inverter 2MT
(Ref. Fig. 401/TASK 25-44-41-991-001)
(1)
Disconnect the electrical connector (4)
(2)
Put blanking caps on the disconnected electrical connectors.
(3) Remove the screws (2), the washers (1) and the static inverter (3). R **ON A/C 106-149, 153-199, 207-299, 301-399, 401-499,
Subtask 25-44-41-020-050-A
A. Removal of the Mini Inverter 10MT
(Ref. Fig. 401A/TASK 25-44-41-991-001-A)
(1)
Remove the screws (2) and the washers (3) and carefully lower the housing (1).
(2)
Unlock the spring latches (4) and disconnect the electrical connector