• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:27来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  - Push the ON/OFF pushbutton. 
R  7. On the steam-oven: 
R  - Push the MEDIUM pushbutton and 
R  set the heater-time to max. 3 
R  minutes. 


R  8. On the steam-oven: 
R  - Do a check of the rotating 
R  field of the fan. 
R  9. On the steam-oven: 
R  - After the set time: 


R  10. On the steam-oven: 
R  - Do the step 7 thru 9 again for 
R  each available temperature. 
R  11. On the steam-oven: 
R  - Push the MEDIUM pushbutton. 

R  - Push the CLEAR pushbutton. 
R  - Push the ON/OFF pushbutton. 

R  5. Close-up________ 
R  Subtask 25-35-00-410-065 
R  A. Close Access 

-
The POWER ON indicator comes on.

On the steam-oven:

-
The blower operates. An usual noise from the blower is heard. Any unusual noise is not permitted.

-
The heater comes on. The temperature will increase.


On the steam-oven:
-See arrow symbols on one of the fan-blades.
On the steam-oven:
-
The TIMER shows 0.

-
The blower stops and the heater goes off.


On the steam-oven:
-A cycle starts with the results given in step 7.
-The cycle stops immediately.
-All indicators and the display go off.
R (1) Put all CB and switches to the initial configuration.
R (2) Depressurize the potable water system (Ref. TASK 38-10-00-614-002).
R (3) Make sure that the steam-oven is in its initial configuration.

R EFF : 051-099, 25-35-00Page 519 May 01/05
 CES


R  (4) Make sure that the work area is clean and clear of tool(s) and other 
R  items. 
R  Subtask 25-35-00-862-076 
R  B. De-energize the aircraft electrical circuits 
R  (Ref. TASK 24-41-00-862-002). 

 

R **ON A/C 001-049, 101-105,
 TASK 25-35-00-710-020
 Operational Test of the Hot-Cup

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power
 3. Job Set-up
__________
 Subtask 25-35-00-861-069

 A. Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002).

 

 Subtask 25-35-00-865-074
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------122VU ELEC/GALLEY/CNTOR 7MC S28 
R  **ON A/C 001-049, 101-102,
 122VU ELEC/GALLEY/CTL  1XA  S26 
R  **ON A/C 103-105,
 122VU ELEC/GALY & CAB/CTL  1XA  S26 
R  **ON A/C 001-049, 101-105, 
R RR 123VU FWD GALLEY/FEEDER F 123VU AFT GALLEY/FEEDER E  16MC 14MC  AC10 AF09 
Subtask 25-35-00-860-058
 C. Aircraft Maintenance Configuration
 (1) Make sure that the pushbutton GALLEY 2XA on the overhead panel 35VU is in the ON position (the white OFF indicator does not come on).
 (2) Make sure that the related CB of the hot-cup on the galley control panel is closed. 

 CES  4. Procedure


_________ Subtask 25-35-00-710-071
 A. Operational Test of the Hot-Cup
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
NOTE : When you use the hot-cup without water this can cause damage to
____
 the hot-cup.

 At the hot-cup: At the hot-cup:
 1. Push the hot-cup into the - The hot-cup starts to heat the water.
 connector. - After a certain time the hot-cup
 temperature cut-out operates and
 switches off the hot-cup.

 At the hot-cup:
 2. Pull the hot-cup from the connector.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备3(45)