• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:27来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (b) If leaks are found, repair all leaks. Subtask 25-35-15-710-052
 G. Do the operational test of the coffee-maker (Ref. TASK 25-35-00-710-013).
R  EFF : 001-049, 101-149, 151-199, 201-299, 25-35-15Page 410 301-399, 401-499, Aug 01/05
 CES  5. Close-up


________ Subtask 25-35-15-410-050
 A. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.
 Subtask 25-35-15-862-050
 B. De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).

R  EFF : 001-049, 101-149, 151-199, 201-299, 25-35-15Page 411 301-399, 401-499, Aug 01/05
 CES  OVEN - REMOVAL/INSTALLATION


___________________________
 TASK 25-35-19-000-001
 Removal of the Oven
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific  2 CAP - BLANKING
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-42-00-861-001  Energize the Ground Service Network from the External Power
 **ON A/C 001-049, 101-105,
 25-35-19-991-001-B Fig. 401 R **ON A/C 051-099, 106-149, 151-199, 201-299, 301-399, 401-499,
 25-35-19-991-001  Fig. 401A
 EFF : ALL
25-35-19Page 401


 **ON A/C ALL
 3. Job Set-up
__________
 Subtask 25-35-19-861-058

 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

 Subtask 25-35-19-865-058
 B. At the related galley on the galley control panel
 (1) Open, safety and tag the related circuit breaker(s) of the oven. Subtask 25-35-19-860-050
 C. Aircraft Maintenance Configuration
 (1) Make sure that the oven is empty.
 4. Procedure
_________
 Subtask 25-35-19-020-050

 A. Removal of the Oven
 **ON A/C 001-049, 101-105,

 (Ref. Fig. 401/TASK 25-35-19-991-001-B) R **ON A/C 051-099, 106-149, 151-199, 201-299, 301-399, 401-499,
 (Ref. Fig. 401A/TASK 25-35-19-991-001)
 **ON A/C ALL

 WARNING : SUPPORT THE UNIT/ASSEMBLY OR IT WILL FALL AND BECOME DAMAGED OR
_______ INJURE PERSONNEL. THE UNIT/ASSEMBLY IS HEAVY.
 WARNING : DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT
_______
 BURNS WHEN YOU DO THE MAINTENANCE TASK(S).

 EFF : ALL
25-35-19Page 402


 Oven Figure 401/TASK 25-35-19-991-001-B 
R  EFF :  001-049, 101-105,  25-35-19 Page 403 May 01/05
 CES 

 

 Oven Figure 401A/TASK 25-35-19-991-001 
R  EFF : 051-099, 106-149, 151-199, 201-299, 301-399, 401-499,  25-35-19 Page 404 Aug 01/05
 CES 

 

 (1)
 Remove the screws (1).

 (2)
 Carefully pull the oven (2) to disconnect the electrical connectors and remove the oven (2) from the galley.

 (3)
 Put CAP - BLANKING on the disconnected electrical connectors.


 EFF : ALL
25-35-19Page 405
May 01/05
R
 CES R **ON A/C 051-099,


R TASK 25-35-19-000-003 R Removal of the Steam-Oven R 1. Reason for the Job
__________________ R Self Explanatory R 2. Job Set-up Information
______________________
R A. Referenced Information
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R 24-42-00-861-001 R R 38-10-00-614-002 R 25-35-19-991-003
R 3. Job Set-up
__________
R Subtask 25-35-19-861-054 Energize the Ground Service Network from the External Power Depressurization of the Potable Water System Fig. 402
R A. Energize the ground service network (Ref. TASK 24-42-00-861-001).
R Subtask 25-35-19-865-055
R B. At the related galley
R (1) Open safty and tag the related power supply circuit breaker(s).
R (2) De-pressurize the potable water system (Ref. TASK 38-10-00-614-002).

R EFF : 051-099, 25-35-19Page 406 May 01/05
 CES  CES
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备3(52)