R  cleaner. 
R  - If necessary replace the air extraction filter(s) (Ref. TASK 25-30-
R  00-960-002). 
R  (2) Hold a suitable sized piece of paper to the applicable air extraction 
R  inlet(s). The paper will stay in position at the air extraction 
R  inlet(s) by the air suction. 
R  (3) Make sure that the work area is clean and clear of tool(s) and other 
R  items. 
R  - If necessary clean the area of the installation-position with a 
R  vacuum cleaner. 
R  (4) Hold the steam-oven (3) in position. 
R  (5) Connect the electrical connector (1). 
R  WARNING : MAKE SURE THAT THE POTABLE WATER SYSTEM IS DEPRESSURIZED. A_______ 
R  PRESSURIZED SYSTEM CAN CAUSE INJURY TO PERSONS WHEN THEY DO 
R  WORK ON IT. 
R  (6) Connect the water supply line (2). 
R  (7) Carefully push the steam-oven into the galley. 
R  (8) Install the screws (14).

 

R  Subtask 25-35-19-865-057 
R  B. Test preparations 
R  (1) Remove the safety tag(s) and clip(s), and close the related circuit 
R  breaker(s). 
R  (2) Pressurize the potable water system (Ref. TASK 38-10-00-614-001). 
R  Subtask 25-35-19-861-056 
R  C. Energize the aircraft electrical circuits (Ref. TASK 24-42-00-861-001). 
R  Subtask 25-35-19-710-052 
R  D. Do the operational test of the steam oven (Ref. TASK 25-35-00-710-016). 
R  5. Close-up________ 
R  Subtask 25-35-19-862-052 
R  A. Close Access 
R  (1) Make sure that the work area is clean and clear of tool(s) and other 
R  items. 
R  (2) De-pressurize the potable water system (Ref. TASK 38-10-00-614-002). 
R  (3) De-energize the aircraft electrical circuits (Ref. TASK 24-42-00-862-
R  001).

 

 HOT CUP - REMOVAL/INSTALLATION
______________________________ TASK 25-35-25-000-001 Removal of the Hot-Cup
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001  Energize the Ground Service Network from the External Power 25-35-25-991-001-A Fig. 401
 3. Job Set-up
__________ Subtask 25-35-25-861-050
 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

 Subtask 25-35-25-865-050
 B. Make sure that the related circuit breaker of the hot-cup at the related galley control panel is open safetied and tagged.
 4. Procedure
_________ Subtask 25-35-25-020-050
 A. Removal of the Hot-Cup
 (Ref. Fig. 401/TASK 25-35-25-991-001-A)

 (1)
 Prevent damage to the component interface and the adjacent area.

 (2)
 Pull the hot-cup holder (3) up.

 (3)
 Pull and remove the hot-cup (1) from the related galley.

 


 Hot-Cup Figure 401/TASK 25-35-25-991-001-A 
R  EFF :  001-049, 101-105,  25-35-25 Page 402 May 01/05
 CES 

 

 TASK 25-35-25-400-001 Installation of the Hot-Cup
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 24-42-00-861-001 Energize the Ground Service Network from the External
 Power 25-35-00-710-020 Operational Test of the Hot-Cup 25-35-25-991-001-A Fig. 401
 3. Job Set-up
__________ Subtask 25-35-25-860-050
 A. Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
 Subtask 25-35-25-865-051
 B. Make sure that the related circuit breaker of the hot-cup at the related galley control panel is open safetied and tagged.


 4. Procedure
_________ Subtask 25-35-25-420-050
 