R Subtask 25-35-19-865-057
R B. Test preparations
R (1) Remove the safety tag(s) and clip(s), and close the related circuit
R breaker(s).
R (2) Pressurize the potable water system (Ref. TASK 38-10-00-614-001).
R Subtask 25-35-19-861-056
R C. Energize the aircraft electrical circuits (Ref. TASK 24-42-00-861-001).
R Subtask 25-35-19-710-052
R D. Do the operational test of the steam oven (Ref. TASK 25-35-00-710-016).
R 5. Close-up________
R Subtask 25-35-19-862-052
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (2) De-pressurize the potable water system (Ref. TASK 38-10-00-614-002).
R (3) De-energize the aircraft electrical circuits (Ref. TASK 24-42-00-862-
R 001).
HOT CUP - REMOVAL/INSTALLATION
______________________________ TASK 25-35-25-000-001 Removal of the Hot-Cup
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 25-35-25-991-001-A Fig. 401
3. Job Set-up
__________ Subtask 25-35-25-861-050
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001).
Subtask 25-35-25-865-050
B. Make sure that the related circuit breaker of the hot-cup at the related galley control panel is open safetied and tagged.
4. Procedure
_________ Subtask 25-35-25-020-050
A. Removal of the Hot-Cup
(Ref. Fig. 401/TASK 25-35-25-991-001-A)
(1)
Prevent damage to the component interface and the adjacent area.
(2)
Pull the hot-cup holder (3) up.
(3)
Pull and remove the hot-cup (1) from the related galley.
Hot-Cup Figure 401/TASK 25-35-25-991-001-A
R EFF : 001-049, 101-105, 25-35-25 Page 402 May 01/05
CES
TASK 25-35-25-400-001 Installation of the Hot-Cup
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 24-42-00-861-001 Energize the Ground Service Network from the External
Power 25-35-00-710-020 Operational Test of the Hot-Cup 25-35-25-991-001-A Fig. 401
3. Job Set-up
__________ Subtask 25-35-25-860-050
A. Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
Subtask 25-35-25-865-051
B. Make sure that the related circuit breaker of the hot-cup at the related galley control panel is open safetied and tagged.
4. Procedure
_________ Subtask 25-35-25-420-050
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备3(55)