• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:06来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 S 394-098
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-31-63
 ALL  ú ú 03 Page 412 ú Mar 15/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 394-103
 (16)
 Make a fillet seal with the BMS 5-95 between the bottom of the galley and the airplane floor (if it is necessary) on the external sides of the galley.

 S 394-104

 (17)
 Install the floor mat in the edge retainers and install the carpet.

 S 394-105

 (18)
 Install the curtain track and header assembly (Ref 25-31-87/401).

 S 424-154

 (19)
 Connect the water connection above the galley.

 S 794-109

 (20)
 Supply the usual water system pressure and examine the galley for leaks (AMM 38-41-00/201).

 S 864-110

 (21)
 Supply electrical power (AMM 24-22-00/201).

 S 864-111

 (22)
 Remove the DO-NOT-CLOSE tags and close the circuit breakers that you opened before.

 S 714-112

 (23)
 Do a check of the galley for the operation of the electrical equipment.

 (24)
 If it is necessary, install the bustle on galley No. 3.

 S 864-114

 (25)
 Remove the electrical power, if it is not necessary (AMM 24-22-00/201).

 S 414-115

 (26)
 Install the equipment and objects you removed from the galley before.


 S 424-222
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-31-63
 ALL  ú ú 03 Page 413 ú Mar 15/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 FORWARD GALLEY HEADER - REMOVAL/INSTALLATION
____________________________________________
 1. General
_______
 A. This procedure contains two tasks:
 (1)
The first task is the removal of the forward galley header.

 (2)
The second task is the installation of the forward galley header.


 TASK 25-31-83-004-026
 2. Forward Galley Header - Removal (Fig. 401)
_______________________________
 A. Access
 (1)  Location Zone
 104 Forward Galley

 B. Procedure
 S 864-027
 (1)  
Open the circuit breaker for the galley lights, on the P18 Main Power Distribution Panel.

 S 024-054

 (2)  
Remove the curtain.

 S 024-055

 (3)  
To remove the galley light, do the steps that follow:

 (a)  
Remove the screws to remove the lightshield from the light.

 (b)  
Remove the light bulbs.

 (c)  
Disconnect the wires from the light.

 (d)  
Hold the light and remove screws that attach the light to the galley header.

 (e)  
Remove the light.

 


 S 024-032
 (4)  Remove the screws that attach the header to the galley No. 1 and the galley No. 2.
 NOTE: Hold the header and the curtain track while you remove the
____
 screws.

 S 024-035
 (5)  Remove the header and the curtain track.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-31-83
 ALL  ú ú 03 Page 401 ú Mar 15/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
SEAL

B-B
Forward Galley Header Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-31-83
 ALL  ú ú 11 Page 402 ú Jul 15/91
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS(96)