• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:06来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

737-300/400/500MAINTENANCE MANUAL
 CARGO COMPARTMENT CEILING LINING - REMOVAL/INSTALLATION
_______________________________________________________
 1.  General_______
 A.  This procedure contains two tasks. The first task is the removal of the ceiling lining. The second task is the installation of the ceiling lining.
 B.  The ceiling lining for the cargo compartment consists of many panels. When you do maintenance procedures in the cargo compartment, it is possible that you will remove some of these panels.
 C.  The ceiling linings in the forward and aft cargo compartments are almost the same. Some linings have openings for blowout panels and lights.
 D.  The removal and installation procedures are for the lining in the forward and the aft cargo compartments.
 TASK 25-52-65-004-017
 2.  Remove the Ceiling Lining (Fig. 401)_________________________
 A.  Access
 (1)  Location Zones
 208 Forward Cargo Compartment
 218 Aft Cargo Compartment

 B.  Procedure
 S 034-002
 (1)  
Remove and discard the tape from the fasteners and seams of the lining.

 S 034-003

 (2)  
Remove the shrouds around the lights and the other ceiling mounted equipment.

 (3)  
Remove the blowout panels, if they are installed (AMM 21-32-41/401).

 (4)  
Remove the fasteners and the cap strips.


 S 024-004
 S 024-005
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-52-65
 ALL  ú ú 01 Page 401 ú Nov 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
ACCESS DOOR

TAPE
FWD
C-C D-D

Cargo Compartment Ceiling Lining Installation
Figure 401 (Sheet 1)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-52-65
 ALL  ú
 ú  01  Page 402
 ú  Jul 15/93 

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
DEPRESSOR STRIP
SHROUD
SUPPORT STRUCTURE
SHROUD SPLICE CLIP
SIDEWALL
SEAL

G-G

Cargo Compartment Ceiling Lining Installation
Figure 401 (Sheet 2)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-52-65
 ALL  ú ú 01 Page 403 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
NUTPLATE

I-I
NUTPLATE

L-L
Cargo Compartment Ceiling Lining Installation
Figure 401 (Sheet 3)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-52-65
 ALL  ú ú 01 Page 404 ú Nov 15/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 024-006
 (5)  
Carefully move apart the velcro tape from the upper surface of the lining.

 S 034-007

 (6)  
Remove the lining.


 TASK 25-52-65-404-018
 3.  Install the Ceiling Lining (Fig. 401)__________________________
 A. Consumable Materials
 (1)  Tape (Ref 20-30-51/201)
 NOTE: Use one of these tapes:
____
 (a)  
G02101 Permacel - Glass cloth, flame resistant, P212HD

 (b)  
G01338 3M 367-FR


 B. References
 (1)  20-30-51/201, Miscellaneous Materials
 C. Access
 (1)  Location Zones
 208 Forward Cargo Compartment
 218 Aft Cargo Compartment

 D. Procedure
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS(137)