• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:06来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 S 214-009
 (1)  
Examine the rubber seals between the lining and the support structure.

 (2)  
Replace the rubber seals if it is necessary.

 (3)
Put the lining against the velcro on the support structure.

 S 434-012

 (4)  
Put pressure on the lining in the areas of the velcro tape to make sure it is fully attached.

 (5)  
Install the cap strips and the screws.


 S 964-010
 S 434-011
 S 424-014
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-52-65
 ALL  ú ú 04 Page 405 ú Nov 15/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 (6)  S 424-013Put new tape on all of the seams and fasteners.
 NOTE:____ Do not use the tape more than one time or you will not get a satisfactory bond.
 (7)  S 424-015If you install a new lining, install the blowout panels (AMM 21-32-41/401) and the heat shroud panels.
 NOTE:____ Some linings do not have blowout panels or heat shroud panels.
 (8)  S 424-016Install the shrouds around the ceiling mounted equipment.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-52-65
 ALL  ú ú 02 Page 406 ú Nov 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 CARGO COMPARTMENT SIDEWALL LINING - REMOVAL/INSTALLATION
________________________________________________________
 1.  General_______
 A.  This procedure contains two tasks. The first task is the removal of the sidewall lining for the cargo compartment. The second task is the installation of the sidewall lining for the cargo compartment.
 B.  The sidewall lining for the cargo compartment consists of fiberglass panels. When you do maintenance procedures in the cargo compartment, it is possible that you will remove the sidewall lining.
 TASK 25-52-73-004-018
 2.  Remove the Sidewall Lining for the Cargo Compartment (Fig. 401)____________________________________________________
 A.  Access
 (1)  Location Zones
 208 Forward Cargo Compartment
 218 Aft Cargo Compartment

 B.  Procedure
 S 024-002
 (1)  
Remove the anchor plates and the cap strips from the sidewall lining.

 S 024-003

 (2)  
Remove and discard the tape.

 (3)  
Remove the screws that hold the sidewall lining.

 S 934-017

 (4)  
Make a note of the different screw lengths to permit an easier installation.

 (5)  
Pull the velcro tape apart.


 S 024-004
 S 024-005
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-52-73
 ALL  ú ú 01 Page 401 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
LINING

Cargo Compartment Sidewall Lining Splice
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-52-73
 ALL  ú ú 01 Page 402 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 034-006
 (6)  Remove the sidewall lining.
 TASK 25-52-73-404-019
 3.  Install the Sidewall Lining for the Cargo Compartment (Fig. 401)_____________________________________________________
 A. Consumable Materials
 (1)  
G00033 Cheesecloth - BMS 15-5 (Ref 20-30-51/201)

 (2)  
Tape (Ref 20-30-51/201)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS(138)