• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:06来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 25-41-17
 LAVATORIES  ú ú 01 Page 401 ú Nov 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 AFT LAVATORY DOOR AND HEADER - REMOVAL/INSTALLATION
___________________________________________________
 1.  General_______
 A. This procedure contains these tasks:
 (1)  
The removal of the Aft Lavatory Door and Header.

 (2)  
The installation of the Aft Lavatory Door and Header.


 TASK 25-41-17-004-001
 2.  Aft Lavatory Door and Header - Removal (Fig. 401)______________________________________
 A. References
 (1)  25-41-19/401, Aft Lavatory Ceiling Panel
 B. Access
 (1)  Location Zone
 113 Aft Lavatory

 C. Procedure
 S 034-003
 (1)  
Remove the ceiling panel (Ref 25-41-19/401).

 S 024-005

 (2)  
Open the door and remove the screws that attach the door hinge to the entryway partition of the control cabin.

 S 024-012

 (3)  
Remove the door.

 S 024-006

 (4)  
Remove the screws that attach the splice plates to the forward and aft panels and remove the header.

 S 024-004

 (5)
If you will replace the header, do the steps that follow:

 (a)  
Remove the support brackets of the ceiling panel.

 (b)  
Remove the splice plates.

 (c)  
Retain the support brackets and the splice plates for later use.

 


 TASK 25-41-17-404-002
 3.  Aft Lavatory Door and Header - Installation (Fig. 401)___________________________________________
 A. References
 (1)  25-41-19/401, Aft Lavatory Ceiling Panel
 B. Access
 (1)  Location Zone
 113 Aft Lavatory

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ALL EXCEPT AIRPLANES WITH MODULAR ú

 25-41-17
 LAVATORIES  ú
 ú 01 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 402Mar 12/00 

A
737-300/400/500MAINTENANCE MANUAL
 C. Procedure
 S 424-007
 (1)  
Put the header into its position and loosely install the screws in the splice plate to attach to the forward and aft panels.

 S 434-008

 (2)  
Temporarily install the ceiling panel to make sure the location of the header is correct.

 S 424-009

 (3)  
Tighten the header forward and aft attachment screws.

 S 424-010

 (4)  
Put the door into its position and install the screws to attach the hinge to the aft edge of the entryway partition.

 (5)  
Install the ceiling panel (Ref 25-41-19/401).


 S 434-011
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ALL EXCEPT AIRPLANES WITH MODULAR ú

 25-41-17
 LAVATORIES  ú
 ú 01 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 403Nov 15/91 

A
737-300/400/500MAINTENANCE MANUAL
 AFT LAVATORY SIDEWALL PANEL - REMOVAL/INSTALLATION
__________________________________________________
 1.  General_______
 A. This procedure contains these tasks:
 (1)  
The removal of the Aft Lavatory Sidewall Panel.

 (2)  
The installation of the Aft Lavatory Sidewall Panel.


 TASK 25-41-18-004-001
 2.  Aft Lavatory Sidewall Panel - Removal (Fig. 401, 402)_____________________________________
 A. References
 (1)  
25-21-71/401, Lowered Ceiling Panels

 (2)  
25-24-81/401, Aft Centerline Stowage Closet

 (3)  
25-31-63/401, Aft Galleys

 (4)  
25-41-17/401, Aft Lavatory Door and Header

 (5)  
25-41-19/401, Aft Lavatory Ceiling Panel

 (6)  
38-11-00/301, Passenger Water System


 B. Access
 (1)  Location Zone
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS(113)