• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:06来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (15)
 Connect lavatory lights wires and remove connection data tags.

 (16)
 Install the lavatory door header (Ref 25-41-13/401).


 S 434-044
 S 434-045
 S 434-046
 S 434-048
 S 434-049
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ALL EXCEPT AIRPLANES WITH MODULAR ú

 25-41-12
 LAVATORIES  ú
 ú 04 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 408Nov 15/94 

A
737-300/400/500MAINTENANCE MANUAL
 S 434-050
 (17)
 Install the lavatory sidewall panel (Ref 25-41-14/401).

 S 434-051

 (18)
 Install the lavatory ceiling panel (Ref 25-41-15/401).

 S 434-052

 (19)
 Install the toilet tank shroud.

 S 434-053

 (20)
 Install the back shroud support angles.

 S 434-054

 (21)
 Install the toilet tank and toilet back shrouds.

 S 434-055

 (22)
 Install all other equipment if it is necessary.

 S 764-056

 (23)
 Supply the electrical power (Ref 24-22-00, MP).

 S 864-059

 (24)
 Remove the DO-NOT-CLOSE tags and close these circuit breakers:

 (a)  
P18 Panel
 1) LAV MIRROR LIGHTS


 (b)  
P6 Panel
 1) LAV MIRROR LIGHTS

 


 (25)
 Make sure the mirror light is on.

 (26)
 Make sure the forward attendant panel operates correctly.

 S 844-060

 (27)
 Remove the electrical power, if it is not necessary (Ref 24-22-00/201).


 S 714-010
 S 714-011
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ALL EXCEPT AIRPLANES WITH MODULAR ú

 25-41-12
 LAVATORIES  ú
 ú 04 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 409Nov 15/94 

A
737-300/400/500MAINTENANCE MANUAL
 FORWARD LAVATORY DOOR AND HEADER - REMOVAL/INSTALLATION
_______________________________________________________
 1.  General_______
 A. This procedure contains these tasks:
 (1)  
The removal of the Forward Lavatory Door and Header.

 (2)  
The installation of the Forward Lavatory Door and Header.


 TASK 25-41-13-004-001
 2.  Door and Header - Removal (Fig. 401)_________________________
 A. Access
 (1)  Location Zone
 103 Forward Lavatory

 B. Procedure
 S 024-002
 (1)  
Open the door and remove the screws that attach the door hinge to the entryway partition.

 S 034-003

 (2)  
Remove the plug buttons of the ceiling panel attachment and remove the panel fasteners.

 S 024-004

 (3)  
Remove the screws that attach the header to the forward and aft support brackets, and remove the header.

 S 424-005

 (4)  
If you will replace the header, remove the support brackets of the ceiling panel and keep them for attachment to the replacement header.


 TASK 25-41-13-404-006
 3.  Door and Header - Installation (Fig. 401)______________________________
 A. Access
 (1)  Location Zone
 103 Forward Lavatory

 B. Procedure
 S 424-007
 (1)  
Put the header into its position and loosely install the screws to attach the header to the forward and aft support brackets.

 S 434-008

 (2)  
Install the fasteners of the lavatory ceiling panel and install the snap-in plug buttons.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ALL EXCEPT AIRPLANES WITH MODULAR ú

 25-41-13
 LAVATORIES  ú
 ú 01 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 401Jul 12/00 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS(107)