 106 Forward Galley Service Door

 B. Procedure
 S 424-012
 (1)  Install the panel that is aft of the door.
 (a)  Move the panel aft below the trim strip.
 S 424-013
 (2)  Install the panel that is forward of the door.
 (a)  Move the panel into the slot on the trim strip.
 S 424-014
 (3)  
Install the trim angle to attach the panels.

 S 434-015

 (4)  
Install the rubber seal in the seal retainer.

 S 434-016

 (5)  
Install the kickplates.

 S 434-017

 (6)  
Install the aid handle that is forward of the door, if it is applicable.

 S 414-019

 (7)  
Install the passenger equipment removed for access to the sidewall lining panels.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-21-35
 ALL  ú ú 01 Page 403 ú Mar 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 SIDEWALL AND CEILING INSULATION - REMOVAL/INSTALLATION
______________________________________________________
 1. General
_______
 A. This procedure contains two tasks:
 (1)  
The removal of the Sidewall and Ceiling Insulation

 (2)  
The installation of the Sidewall and Ceiling Insulation


 TASK 25-21-39-004-001
 2. Sidewall and Ceiling Insulation Removal
_______________________________________
 A. References
 (1)  AMM 25-21-01/001, Passenger Cabin Lining and Insulation
 B. Access
 (1)  Location Zone
 100 Upper Half of Fuselage

 C. Procedure
 S 014-002
 (1)  Remove the component of the cabin lining ,if it is necessary to get access to the insulation (AMM 25-21-01/001).
 (a)  If it is necessary, remove the equipment installed through the insulation.
 S 024-003
 (2) Remove the joint tape and the retainers, if it is necessary.
 NOTE: The tape and retainer that attach the insulation around the
____ stringers and air ducts must be removed first.
 S 024-004
 (3)  Remove the insulation blankets after you removed all the blockage .
 (a)  
Remove a blanket free from the hook and pile tape on the airplane structure, when it is necessary.

 (b)  
Make a mark on the insulation components for installation.


 TASK 25-21-39-404-005
 3. Sidewall and Ceiling Insulation Installation
____________________________________________
 A. Consumable Materials
 (1)  G01288 Tape - Doubleback Permacel P55-B ( 1-inch wide)
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-21-39
 ALL  ú ú 01 Page 401 ú Mar 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 (2)  G02127 Tape - Flame Resistant Adhesive 3M No. 474, Parmacel
 B.  References
 (1)  AMM 25-21-01/001, Passenger Cabin Lining and Insulation
 C.  Access
 (1)  Location Zone
 100 Upper Half of Fuselage

 D.  Procedure
 S 424-006
 (1)  Install the insulation blankets in their positions.
 (a)  At the window, align the opening in the blanket until the reveal attaches smoothly when installed .
 NOTE: The blanket must touch the reveal around its edges to
____
 make an air seal.

 (b)  Where the insulation is installed with the hook and pile tape,
 1)  Align the tape on the insulation with the tape bonded to the airplane structure and push tightly.
 S 424-007
 (2)  
Install the retainers where it is applicable.

 S 214-008

 (3)  
Make sure the insulation blankets attach tightly around the structure or support brackets.


 (a)  Apply the one face tape to install and seal the insulation blankets tightly around the brackets, if it is necessary.
 