• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:06来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 help the stitch and to move the blanket.
 1) Make sure the attachment (staple) is between the stitch and

 the outer edge of the blanket. 2) Make sure the attachment (staple) is not on the surface of
 the completed blanket.Lock all the edges and openings of the blanket with the fabric strip. 1) On the edges where the flaps are necessary,
 a) Make the flaps the same width as the damaged blanket. 2) On the edges with a full thickness of the blanket, a) Bond the nylon cover with the synthetic rubber adhesive.
 3)  On the edges where you sew the nylon cover, a) Use an 4-string cotton thread, b) Put 4-6 stitches in an inch (4 is recommended).
 4) Install the nylon fabric grommets through the holes in the blanket. 5) Bond the grommets to the blanket with the synthetic rubber adhesive.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-21-39
 ALL  ú ú 01 Page 805 ú Mar 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 WARNING: DO NOT GET SOLVENTS IN YOUR MOUTH, OR YOUR EYES, OR ON
_______ YOUR SKIN. DO NOT BREATHE THE FUMES FROM SOLVENTS. SOLVENTS ARE HAZARDOUS MATERIALS. SOLVENTS MAY BE FLAMMABLE OR HARMFUL TO THE ENVIRONMENT. REFER TO PRODUCT MATERIAL SAFETY DATA SHEETS (MSDS) AND LOCAL REUIREMENTS FOR PROPER HANDLING PROCEDURES.
 (h) For the ceiling blanket on the passenger cabin,
 1)  Seal the stitches on the outboard side of the blanket with a continuous bead of the synthetic rubber adhesive.
 NOTE: Put a thin layer of the methyl ethyl ketone to make
____
 the seal easier.

 S 428-010
 (3) Install the new insulation blanket (Ref 25-21-39/401).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-21-39
 ALL  ú ú 02 Page 806 ú Jul 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 SCULPTURED CEILING PANELS - REMOVAL/INSTALLATION
________________________________________________
 1.  General_______
 A. This procedure has these tasks:
 (1)  
The removal of the Sculptured Ceiling Panel

 (2)  
The installation of the Sculptured Ceiling Panel


 TASK 25-21-45-004-001
 2.  Sculptured Ceiling Panel - Removal (Fig. 401)__________________________________
 A. Access
 (1)  Location Zone
 100 Upper Half of Fuselage

 B. Procedure
 S 024-011
 CAUTION:_______BE CAREFUL WITH THE PANELS. YOU CAN DAMAGE THE PANELS IF YOU HIT THEM OR GET THEM DIRTY.
 (1)  
Push the lever to release the hinge.

 S 024-003

 (2)  
Move the panel outboard until the inboard edge disengages from the air outlet extrusion.

 S 024-004

 (3)  
Lower the panel and disconnect the lanyard.

 (4)  
Remove the panel.


 S 024-005
 TASK 25-21-45-404-006
 3.  Sculptured Ceiling Panel - Installation (Fig. 401)_______________________________________
 A. Access
 (1)  Location Zone
 100 Upper Half of Fuselage

 B. Procedure
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-21-45
 ALL  ú ú 01 Page 401 ú Mar 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL

Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-21-45
 ALL  ú ú 01 Page 402 ú Nov 15/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS(54)