• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:06来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ALL EXCEPT AIRPLANES WITH MODULAR ú

 25-41-14
 LAVATORIES  ú
 ú 01 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 403Nov 15/91 

A
737-300/400/500MAINTENANCE MANUAL
 TASK 25-41-14-404-011
 3.  Forward Lavatory Sidewall Panel - Installation (Fig. 401)______________________________________________
 A. References
 (1)  
Ch. 21 Air Conditioning

 (2)  
AMM 23-31-13/401, Lavatory Speaker

 (3)  
AMM 26-14-11/401, Lavatory Smoke Detector


 B. Access
 (1)  Location Zone
 103 Forward Lavatory Sidewall Panel

 C. Procedure
 S 434-012
 (1)  
If removed, install the trim strip.

 S 434-014

 (2)  
Put the panel into its position, put into the trim strip and align with the attachment brackets on the forward and aft partitions.

 S 434-015

 (3)  
Put the electrical wires of the dispenser cabinet through the grommet to the inboard side of the panel.

 (4)
Install the panel fasteners at the forward and aft panel edges.

 (5)  
Install the disposal and dispenser cabinets.

 (6)  
Install the speaker (AMM 23-31-13/401).

 (7)  
Install the gasper air outlet (Ref Chapter 21, Air Conditioning).


 S 424-016
 S 434-017
 S 434-018
 S 434-020
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ALL EXCEPT AIRPLANES WITH MODULAR ú

 25-41-14
 LAVATORIES  ú
 ú 01 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 404Jul 12/01 

A
737-300/400/500MAINTENANCE MANUAL
 FORWARD LAVATORY CEILING PANEL - REMOVAL/INSTALLATION
_____________________________________________________
 1. General
_______
 A. This procedure contains these tasks:
 (1)  
The removal of the Forward Lavatory Ceiling Panel.

 (2)  
The installation of the Forward Lavatory Ceiling Panel.


 TASK 25-41-15-004-001
 2. Forward Lavatory Ceiling Panel - Removal (Fig. 401)
________________________________________
 A. References
 (1)  AMM 35-22-11/201, Oxygen Generator
 B. Access
 (1)  Location Zone
 103 Forward Lavatory Ceiling Panel

 C. Procedure
 S 864-002
 (1) Open these circuit breakers and attach DO-NOT-CLOSE tags:
 (a)  P18 Panel 1) Lavatory Dome Light 2) All the circuit breakers of the oxygen system.
 S 044-003
 (2)
Disconnect the mask box oxygen generator (AMM 35-22-11/201).

 S 024-004

 (3)  
Remove the snap-in plug buttons and remove the panel attachment screws.

 S 024-005

 (4)  
Push up on the ceiling panel until the panel disconnects from the strip, then lower the panel until you can get the electrical wires.


 NOTE: The ceiling panel and the trim strip are attached with
____
 tape.

 S 034-006
 (5)  
Disconnect the electrical wires from the light.

 (6)  
Remove the ceiling panel.

 S 034-008

 (7)  
If you will replace the ceiling panel, remove the service unit and the dome light and keep them in a safe location.


 S 024-007
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ALL EXCEPT AIRPLANES WITH MODULAR ú

 25-41-15
 LAVATORIES  ú
 ú 01 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 401Jul 12/00 

A 737-300/400/500MAINTENANCE MANUAL

CEILING PANEL AND SIDEWALL PANEL
C
Forward Lavatory Ceiling Panel Installation Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ALL EXCEPT AIRPLANES WITH MODULAR ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS(109)