• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:06来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

______________________________________________________________________
 1.  General
_______
 A.  This procedure contains these tasks:
 (1)  
The removal of the Passenger Service Units (PSUs)

 (2)  
The installation of the Passenger Service Units (PSUs)

 (3)  
The removal of the Spacer Panel

 (4)  
The installation of the Spacer Panel

 (5)  
The adjustment of the Passenger Service Units (PSUs)


 TASK 25-23-61-002-035
 2.  Passenger Service Units (PSUs) Removal (Fig. 201)
______________________________________
 A.  Special Tools and Equipment
 (1)  Firing Pin Retraction Equipment - A35001-1
 B.  References
 (1)  
24-22-00/201, Manual Control

 (2)  
35-22-11/201, Oxygen Generator


 C.  Access
 (1)  Location Zone
 100 Upper Half Fuselage

 D.  Prepare for the Removal
 S 862-001
 (1)  Remove the electrical power (Ref 24-22-00/201).
 E.  Procedure
 S 012-002
 (1)  Lower the PSUs
 (a)  
Release the latches

 1)  Put a small Allen wrench or other applicable tool in the access holes.

 (b)  
Not fully lower the PSUs and disconnect the lanyard.

 (c)  
Move the PSUs down to the fully open position.


 S 422-077
 (2)  
Isolate the oxygen generator and install the safety pin (Detail B) (Ref 35-22-11/201).

 (3)
Disconnect the gasper air duct and the electrical connector.

 S 022-005

 (4)  
Hold the PSUs and disconnect the lanyard from the support structure (detail A).

 S 022-007

 (5)  
Push the plungers on the clamps (section A-A) to release the hinge points from the air outlet extrusion.


 S 032-004
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-23-61
 ALL  ú ú 01 Page 201 ú Jul 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

737-300/400/500MAINTENANCE MANUAL
OVERHEAD STOWAGE BIN
LATCH RELEASE
ACCESS HOLES

AIR OUTLET PSU SUPPORTEXTRUSION STRUCTURE
A A
SPACER PANEL
SEE C
PSU
SEE A
WIRE BUNDLE
WIRE BUNDLE/GASPER CONNECTOR
HOSE BRACKET OXYGEN GENERATOR
SEE B
GASPER AIR HOSE

OXYGEN
HOSE
LANYARD

PSU (LOWERED)
PSU (EXAMPLE)
A
PSU Installation Figure 201 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-23-61
 ALL  ú ú 01 Page 202 ú Mar 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL

 

SERVICE UNIT LOCATION
SAFETY PIN MUST BE REMOVED WHEN PSU IS INSTALLED, SO THAT GENERATOR WILL OPERATE IN AN EMERGENCY
21.5 INCHES (MAX), 10.5 INCHES (MIN)
PSU Installation Figure 201 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-23-61
 ALL  ú ú 01 Page 203 ú Nov 15/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
INDEX SPRING  INDEX SPRING

(REF)  (REF) 
3 PIECE  2 PIECE 
SPACER PANEL 
(ADJUSTABLE, EXAMPLE) 


PSU Installation
Figure 201 (Sheet 3)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-23-61
 ALL  ú ú 01 Page 204 ú Jul 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS(64)