• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:06来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 TASK 25-41-19-004-037
 2.  Aft Lavatory Ceiling Panel - Removal (Fig. 401)____________________________________
 A.  References
 (1)  
26-14-11/401, Lavatory Smoke Detector

 (2)  
35-22-11/201, Oxygen generator

 (3)  
35-22-21/401, Door Latch Actuator


 B.  Access
 (1)  Location Zone
 113 Left Aft Lavatory
 114 Right Aft Lavatory

 C.  Procedure
 S 864-001
 (1)  
Open these circuit breakers and attach DO-NOT-CLOSE tags:

 (a)  P18 Panel
 1) Lavatory Dome Light
 2) Oxygen System


 (2)
Set the mask box oxygen generator to off (Ref 35-22-11/201).

 S 024-006

 (3)  
Remove the snap-in plug buttons and remove the panel attachment screws.

 (4)
Lower the panel until you can get access to the electrical wires.

 S 034-008

 (5)  
Disconnect the electrical wires from the light and passenger address speaker, and tag the wires for installation.

 S 034-013

 (6)  
Disconnect the electrical wires to the door latch actuator of the oxygen mask box (Ref 35-22-21/401).

 (7)  
Remove the ceiling panel.


 S 864-005
 S 034-007
 S 024-014
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ALL EXCEPT AIRPLANES WITH MODULAR ú

 25-41-19
 LAVATORIES  ú
 ú 01 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 401Mar 12/00 

A 737-300/400/500MAINTENANCE MANUAL

CEILING PANEL ATTACHMENT (6 LOCATIONS)

B
Aft Lavatory Ceiling Panel Installation Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ALL EXCEPT AIRPLANES WITH MODULAR ú

 25-41-19
 LAVATORIES  ú
 ú 01 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 402Nov 15/91 

A 737-300/400/500MAINTENANCE MANUAL
 S 034-015
 (8)  If you will replace the ceiling panel, remove the service unit and the dome light and keep them for subsequent use.
 TASK 25-41-19-404-038
 3. Aft Lavatory Ceiling Panel - Installation (Fig. 401)
_________________________________________
 A. References
 (1)  
24-22-00/201, Manual Control

 (2)  
35-22-11/201, Oxygen Generator

 (3)  
35-22-21/401, Door Latch Actuator


 B. Access
 (1)  Location Zone
 113 Left Aft Lavatory
 114 Right Aft Lavatory

 C. Procedure
 S 434-020
 (1)  
If it is neccessary, install the service unit and the dome light in the ceiling panel.

 S 434-021

 (2)  
Put the panel in its position and temporarily attach it.

 S 434-022

 (3)  
Connect the dome light and the electrical wires of the passenger address speaker.

 S 434-023

 (4)  
Connect the electrical wires to the oxygen mask box latch (Ref 35-22-21/401).

 S 864-028

 (5)  
Supply electrical power (Ref 24-22-00/201).

 S 864-029

 (6)
Close these circuit breakers and remove the DO-NOT-CLOSE tags:

 (a)  P18 Panel
 1) Lavatory Dome Light
 2) Oxygen System


 (7)  
Make sure the lavatory dome light is on.

 S 424-033

 (8)  
Remove the temporary ties, put the panel into its position, and install the panel attachment screws.


 S 434-030
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ALL EXCEPT AIRPLANES WITH MODULAR ú

 25-41-19
 LAVATORIES  ú
 ú 01 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 403Nov 15/91 


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS(118)