25-24-31
ALL ú ú 01 Page 401 ú Mar 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
B-B
Overhead Stowage Bin Installation Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-24-31
ALL ú ú 01 Page 402 ú Nov 15/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
S 024-009
(8) Remove the overhead stowage bin.
TASK 25-24-31-404-010
3. Overhead Stowage Bin installation (Fig. 401)
_________________________________
A. References
(1)
21-61-31/401, Passenger Cabin Temperature Sensor
(2)
25-21-45/401, Sculpture Ceiling Panels
(3)
25-21-71/401, Lowered Ceiling Panels
(4)
25-23-61/201, Passenger Cabin Passenger Service Units (PSU's)
(5)
33-21-03/201, Passenger Cabin Illumination
(6)
AMM 33-51-21/201, Aisle Lights
B. Access
(1) Location Zone
100 Upper Half of Fuselage
C. Procedure
S 424-011
(1)
Install the overhead stowage bin between the adjacent stowage bins or the structure and install the alignment pins.
S 424-012
(2)
Install the bolt, washers and nut to attach each turnbuckle.
S 424-013
(3)
Adjust the turnbuckles to hold the weight of the stowage bin while you align with the adjacent stowage bins.
S 414-014
(4)
Install the ceiling panels (Ref 25-21-45/401, 25-21-71/401).
S 414-015
(5)
Install the fluorescent light (Ref 33-21-03/201), if it is necessary.
S 434-016
(6)
Attach the inboard edge of the bullnose to the extrusion.
S 414-017
(7)
Install the emergency aisle light (AMM 33-51-21/201) or the zone temperature sensor (AMM 21-61-31/401), if it is necessary.
(8)
Lift the bullnose and install the screws.
(9)
Install the PSU's and the spacer panels (Ref 25-23-61/201).
S 414-018
S 414-019
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-24-31
ALL ú ú 01 Page 403 ú Mar 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
OVERHEAD STOWAGE BIN DOOR - MAINTENANCE PRACTICES
_________________________________________________
1. General_______
A. This procedure has these tasks:
(1)
The removal of the Actuator
(2)
The installation of the Actuator
(3)
The removal of the Hinge Quadrant
(4)
The installation of the Hinge Quadrant
(5)
The removal of the Door
(6)
The installation of the Door
(7)
The removal of the Latch Assembly
(8)
The installation of the Latch Assembly
(9)
The Storage Bin Door Does Not Close
(10)
The adjustment of the Latch Assembly
TASK 25-24-36-002-001
2. Actuator Removal (Fig. 201)________________
A. Access
(1) Location Zones
100 Upper Half of Fuselage
B. Procedure
S 012-002
(1)
Open the overhead bin door.
S 022-003
(2)
Hold the door and remove the bolts that attach each actuator chassis to the stowage bin sidewall.
S 022-004
(3)
Remove the door with the actuator chassis assemblies.
S 022-005
(4)
Remove the pins that attach the actuator to the chassis and the hinge quadrant.
(5)
Remove the actuator.
S 022-006
TASK 25-24-36-402-007
3. Actuator Installation (Fig. 201)_____________________
A. General