25-24-15
ALL ú ú 03 Page 401 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
Windscreen Installation
Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-24-15
ALL ú ú 04 Page 402 ú Mar 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
B. Access
(1) Location Zone
107 Fwd Half of Fuselage
108 Aft Half of Fuselage
C. Procedure
S 424-068
(1)
Install the loose fittings in the floor tracks.
S 424-069
(2)
Move the windscreen in the position and set it down over the floor track studs.
S 414-070
(3)
Open the lower doors in the windscreen cabinet to get access to the floor track attachments.
S 424-071
(4)
Install the nuts on the floor track attachments.
S 434-072
(5)
Connect the wire bundle at the outboard edge of the windscreen.
D. Put the Airplane Back to its Usual Condition
S 864-093
(1)
Supply electrical power (AMM 24-22-00/201).
S 864-094
(2)
Examine for the correct operation of the electrical devices that changed by the removal/installation procedure.
S 864-095
(3)
Remove the electrical power if it is not necessary
(AMM 24-22-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-24-15
ALL ú ú 03 Page 403 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
OVERHEAD STOWAGE BIN - REMOVAL/INSTALLATION
___________________________________________
1. General_______
A. This subject has two tasks:
(1)
The removal of the Overhead Stowage Bin
(2)
The installation of the Overhead Stowage Bin
TASK 25-24-31-004-001
2. Overhead Stowage Bin Removal (Fig. 401)____________________________
A. References
(1)
21-61-31/401, Passenger Cabin Temperature Sensor
(2)
25-21-45/401, Sculpture Ceiling Panels
(3)
25-21-71/401, Lowered Ceiling Panels
(4)
25-23-61/201, Passenger Cabin Passenger Service Units (PSU's)
(5)
33-21-03/201, Passenger Cabin Illumination
(6)
AMM 33-51-21/201, Aisle Lights
B. Access
(1) Location Zone
100 Upper Half of Fuselage
C. Procedure
S 014-002
(1)
Remove the ceiling panels installed on the stowage bin (Ref 25-21-45/401; 25-21-71/401).
S 014-003
(2)
Remove the fluorescent light (Ref 33-21-03/201), if installed, and disconnect the electrical connector.
S 014-004
(3)
Remove the passenger service units (PSU's) and the spacer panels to get the access to the lower supports (Ref 25-23-61/201).
S 034-005
(4)
Remove the bullnose
(a)
Remove the screws on the outboard side of the bullnose.
(b)
Remove the emergency aisle light (AMM 33-51-21/201) or the zone temperature sensor (AMM 21-61-31/401), if installed.
(c)
Remove the bullnose.
(5)
Remove the alignment pins between the adjacent stowage bins.
S 024-007
(6)
Remove the bolts to disconnect the turnbuckles at the bottom outboard side of the stowage bin.
S 024-008
(7)
Hold the stowage bin and remove the bolts to disconnect the top turnbuckles.
S 034-006
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS(70)