 WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______
 WHEN YOU DO THE MAINTENANCE TASK(S).
 __________________

1.
 Reason for the Job

 2.
 Job Set-up Information


R  Refer to the MPD TASK: 499100-B2 ______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)
 No specific warning notice
 No specific container 10 l (2.6416 USgal)
 No specific access platform 3.5 m (11 ft. 6 in.)

 B. Consumable Materials
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
Material No. 03-002  GB DEF-STAN 91-101
 LUBRICATING OIL TURBINE ENGINE SYNT BASE
 (Ref. 20-31-00)

 C. Expendable Parts
 -------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION  |IPC-CSN
 -------------------------------------------------------------------------------
2 filter element 49-91-45 70 -030 3 o-ring 49-91-45 70 -020

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-91-41Page 201 201-210, Config-2 Aug 01/05
 CES  D. Referenced Information


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-23-51-000-001  Removal of the APU Generator 8XS
 24-23-51-400-001  Installation of the APU Generator 8XS
 24-42-00-861-001  Energize the Ground Service Network from the External
 Power
 24-42-00-862-001  De-energize the Ground Service Network Supplied from
 the External Power
 29-00-00-864-001  Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action
 29-14-00-614-002  Pressurization of the Hydraulic Reservoirs through
 the Ground Connector
 49-00-00-860-008  APU Start by External Power (131-9(A))
 49-00-00-860-009  APU Shutdown by External Power (131-9(A))
 49-11-00-400-006  Installation of the Generator Substitution Kit
 (Flight without Generator) (131-9(A))
 49-90-00-600-007  Check and Replenish Oil Level (131-9(A))
 52-41-00-010-001  Open the APU Doors for Access
 52-41-00-410-001  Close the APU Doors after Access
 49-91-41-991-004  Fig. 201
 3. Job Set-up__________
 Subtask 49-91-41-860-060

 A. Aircraft Maintenance Configuration
 (1)
 Energize the ground service network (Ref. TASK 24-42-00-861-001).

 (2)
 On the panel 25VU, make sure that the APU MASTER SW p/bsw is OFF.

 (3)
 Put a warning notice in the cockpit to tell persons not to start the APU.

 (4)
 Make sure that hydraulic systems are depressurized (Ref. TASK 29-00-00-864-001).

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-91-41Page 202 201-210, Config-2 Aug 01/05
 CES  Subtask 49-91-41-865-063


 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 49-91-41-010-055
 C. Get Access
 (1)
 Put the access platform below the APU access doors 315AL and 316AR.

 (2)
 Open the access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).

 (3)
 Set the LIGHT SW 11LJ to the ON position.


 4. Procedure
_________ (Ref. Fig. 201/TASK 49-91-41-991-004) Subtask 49-91-41-020-056
 A. Removal of the Filters.
 (1)
 Put the container below the oil filter housings (4).

 (2)
 Disconnect the electrical connectors (5).

 (3)
 Put blanking caps on the disconnected electrical connectors.

 (4)
 Remove the filter housings (4) from the lube module (1) and discard the filter elements (2).


 (5)
 Remove and discard the O-rings (3). Subtask 49-91-41-420-057
 