• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 14:47来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 A. Remove the Drain Plug (8077KM)
 (1)
 Put the container to the position below the drain plug (8077KM) (1).

 (2)
 Remove and discard the safety wire from the drain plug (8077KM) (1).

 (3)
 Remove the drain plug (8077KM) (1) from the gearbox housing assembly.

 (4)
 Remove and discard the packing from the drain plug (8077KM) (1).

 (5)
 Drain the APU oil (Ref. TASK 49-90-00-600-001) into the container.

 


 Drain Plug
 Figure 201/TASK 49-91-42-991-001

 CES


 TASK 49-91-42-400-001
 Installation of the Drain Plug (8077KM) (GTCP 36-300)

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  Torque Wrench : range 0.00 to 1.20 m.daN
 (0.00 to 9.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific  lockwire-corrosion resistant steel 0.8 mm (0.032 in) dia
 Material No. 03-002  GB DEF-STAN 91-101 LUBRICATING OIL TURBINE ENGINE SYNT BASE (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
o-ring  49-91-04 02 -140


 D. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 49-00-00-860-003 APU Start by External Power (GTCP 36-300) 49-00-00-860-004 APU Shutdown by External Power (GTCP 36-300) 49-90-00-600-001 Check Oil Level and Replenish (GTCP 36-300) 52-41-00-010-001 Open the APU Doors for Access 52-41-00-410-001 Close the APU Doors after Access
 3. Job Set-up
__________
 Subtask 49-91-42-860-057
 A. Aircraft Maintenance Configuration
 (1)
 On the panel 25VU make sure that the APU MASTER SW pushbutton switch is off.

 (2)
 Make sure that there is a warning notice in the cockpit to tell persons not to start the APU.

 (3)
 Make sure that hydraulic systems are depressurized
 (Ref. TASK 29-00-00-864-001).


 (4)
 Make sure that ground fire extinguishing equipment is available.

 (5)
 Make sure that the access platform is in position below the APU compartment.

 (6)
 Make sure that the APU access doors are open (Ref. TASK 52-41-00-010-001).


 Subtask 49-91-42-865-062
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41


 4. Procedure
_________ Subtask 49-91-42-420-050
 A. Installation of the Drain Plug (8077KM)
 (1)
 Apply a thin layer of lubricant OILS (Material No. 03-002) to the new o-ring (4).

 (2)
 Install the new o-ring (4) on the drain plug (8077KM) (1).

 (3)
 Install the drain plug (8077KM) (1) in the gearbox housing assembly.

 (4)
 TORQUE the drain plug to 0.56 m.daN (49.55 lbf.in).

 (5)
 Safety the drain plug with lockwire-corrosion resistant steel 0.8 mm


 (0.032 in) dia.
 (6)
 Fill the APU oil system (Ref. TASK 49-90-00-600-001). Subtask 49-91-42-865-051

 B.
 Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1KD, 2KD


 Subtask 49-91-42-710-051
 C. Start and Operate the APU.
 (1)
 Close the APU access doors (Ref. TASK 52-41-00-410-001).

 (2)
 Start the APU (Ref. TASK 49-00-00-860-003).

 (3)
 Allows the APU to run 5 minutes.

 (4)
 Shutdown the APU (Ref. TASK 49-00-00-860-004).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER 6(105)