No specific  lockwire-corrosion resistant steel 0.8 mm (0.032 in.) dia
 Material No. 03-002  GB DEF-STAN 91-101
 LUBRICATING OIL TURBINE ENGINE SYNT BASE
 (Ref. 20-31-00)

 

 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
1  O-ring  49-91-41 01 -040
 1  O-ring  49-91-41 01A-040
 2  filter element  49-91-41 01 -030
 2  filter element  49-91-41 01A-030
 4  O-ring  49-91-41 01 -020
 4  O-ring  49-91-41 01A-020
 D. Referenced Information

 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-23-51-000-001  Removal of the APU Generator 8XS
 24-23-51-400-001  Installation of the APU Generator 8XS
 24-42-00-861-001  Energize the Ground Service Network from the External
 Power
 24-42-00-862-001  De-energize the Ground Service Network Supplied from
 the External Power
 29-00-00-864-001  Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action
 29-14-00-614-002  Pressurization of the Hydraulic Reservoirs through
 the Ground Connector
 49-00-00-860-003  APU Start by External Power (GTCP 36-300)
 49-00-00-860-004  APU Shutdown by External Power (GTCP 36-300)
 49-11-00-000-002  Removal of the Generator Substitution Kit (GTCP
 36-300)
 49-11-00-400-002  Installation of the Generator Substitution Kit
 (Flight without Generator) (GTCP 36-300)
 49-11-11-000-001  Removal of the Auxiliary Power Unit (APU) - 4005KM
 (GTCP 36-300)
 49-11-11-400-001  Installation of the Auxiliary Power Unit (APU) -
4005KM (GTCP 36-300)
 49-90-00-600-001  Check Oil Level and Replenish (GTCP 36-300)
 52-41-00-010-001  Open the APU Doors for Access
 52-41-00-410-001  Close the APU Doors after Access
 49-91-41-991-001  Fig. 201 

 

 3. Job Set-up
__________ Subtask 49-91-41-860-058
 A. Aircraft Maintenance Configuration
 (1)
 Energize the ground service network
 (Ref. TASK 24-42-00-861-001).


 (2)
 On the panel 25VU, make sure that the APU MASTER SW p/bsw is OFF.

 (3)
 Put a warning notice in the cockpit to tell persons not to start the APU.

 (4)
 Make sure that hydraulic systems are depressurized
 (Ref. TASK 29-00-00-864-001).

 

 Subtask 49-91-41-865-050
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 49-91-41-010-050
 C. Get Access
 (1)
 Put the access platform below the APU access doors 315AL and 316AR.

 (2)
 Open the access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).

 (3)
 Set the LIGHT SW 11LJ to the ON position.

 


 4. Procedure
_________
 (Ref. Fig. 201/TASK 49-91-41-991-001) Subtask 49-91-41-020-050
 A. Remove the generator scavange filter (8069KM)
 (1)
 Disconnect the electrical connector (5) from the differential pressure switch.

 (2)
 Put the container below the oil filter housing (4).

 (3)
 Remove and discard the lockwire from the filter housing (4).

 (4)
 Remove the filter housing (4) with the filter element (2).

 (5)
 Remove and discard the filter element (2) from the filter housing (4).


 (6)
 Remove and discard the O-rings (1) and (3). Subtask 49-91-41-420-050

 B.
 Installation of the Alternator Scavenge Filter Element (8069KM)

 (1)
 Apply a thin layer of OILS (Material No. 03-002) to the new O-ring (1).

 (2)
 Install the new O-ring (1) to the new filter element (2).

 (3)
 Apply a thin layer of OILS (Material No. 03-002) to the new O-ring (3).

 (4)
 Install the new O-ring (4) to the filter housing (4).
 