 Subtask 49-94-14-710-050
 D. Start and Operate the APU to check the System Report/Test on the MCDU
 (1)
 Start and operate the APU (Ref. TASK 49-00-00-860-003).

 (2)
 Allow the APU to run for 5 minutes to check the System Report/Test on the MCDU.


 NOTE : The SYSTEM SELF-TEST page must not show low oil-pressure
____
 switch.

 (3)
 Shutdown the APU (Ref. TASK 49-00-00-860-004).

 (4)
 Do a leak check of the low oil-pressure switch.
 NOTE : No leaks are permitted.

 

____
 5. Close-up
________ Subtask 49-94-14-410-050
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Set the LIGHT SW 11LJ to the OFF position.

 (3)
 Close the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-410-001).

 (4)
 Remove the access platform(s).

 


 Subtask 49-94-14-865-061
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 49-94-14-860-055
 C. Aircraft Maintenance Configuration
 (1)
 Pressurize the reservoirs of the hydraulic systems.
 (Ref. TASK 29-14-00-614-002).


 (2)
 De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).


 (3)
 Remove the warning notice(s).

 


 PRESSURE SWITCH - OIL - REMOVAL/INSTALLATION
____________________________________________
 TASK 49-94-14-000-003
 Removal of the Low Oil Pressure Switch (8091KM) (131-9(A))
 WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______ WHEN YOU DO THE MAINTENANCE TASK(S).
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific blanking caps
 No specific blanking plug
 No specific circuit breaker(s) safety clip(s)
 No specific warning notice
 No specific container 2 l (0.5283 USgal)
 No specific access platform 3.5 m (11 ft. 6 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 52-41-00-010-001 Open the APU Doors for Access 49-94-14-991-003 Fig. 401

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-94-14Page 401 201-210, Config-2 Aug 01/05
 CES  3. Job Set-up


__________ Subtask 49-94-14-860-056
 A. Aircraft Maintenance Configuration
 (1)
 Energize the ground service network
 (Ref. TASK 24-42-00-861-001).


 (2)
 On the panel 25VU, make sure that the APU MASTER SW p/bsw is OFF.

 (3)
 Put a warning notice in the cockpit to tell persons not to start the APU.

 (4)
 Make sure that hydraulic systems are depressurized
 (Ref. TASK 29-00-00-864-001).

 

 Subtask 49-94-14-865-058
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 49-94-14-010-053
 C. Get Access
 (1)
 Put the access platform in position below the APU access doors 315AL and 316AR.

 (2)
 Open the APU access doors 315AL and 316AR (Ref. TASK 52-41-00-010-001).

 (3)
 Set the LIGHT SW 11LJ to the ON position.

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-94-14Page 402 201-210, Config-2 Aug 01/05
 CES  4. Procedure


 