(3)
Close the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-410-001).
(4)
Remove the access platform(s). Subtask 49-81-00-865-073
B.
Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1KD, 2KD
R EFF : 001-049, 101-105, 107-107, 151-199, 49-81-00Page 616 201-210, Config-2 Aug 01/05
CES Subtask 49-81-00-860-071
C. Aircraft Maintenance Configuration
(1)
Pressurize the reservoirs of the hydraulic systems. (Ref. TASK 29-14-00-614-002).
(2)
De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
(3)
Remove the warning notice(s).
R EFF : 001-049, 101-105, 107-107, 151-199, 49-81-00Page 617 201-210, Config-2 Aug 01/05
CES EXHAUST SYSTEM ((APS 3200)) - INSPECTION/CHECK
______________________________________________
TASK 49-81-00-200-004
Visual Check of the Sealing Ring Coupling, V-Clamp and Portion of Exhaust Duct Inside of the APU Compartment (APS 3200)
WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______ WHEN YOU DO THE MAINTENANCE TASK(S).
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific access platform 3.5 m (11 ft. 6 in.)
No specific Torque Wrench : range 0.00 to 1.20 m.daN
(0.00
to 9.00 lbf.ft) No specific Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
B.
Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 19-010 USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)
C. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
1 insulation bracket 49-81-04 01 -033 2 insulation bracket 49-81-04 01 -037
D. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action 49-81-41-000-002 Removal of the Exhaust Muffler (APS 3200) 49-81-41-400-002 Installation of the Exhaust Muffler (APS 3200) 52-41-00-010-001 Open the APU Doors for Access 52-41-00-410-001 Close the APU Doors after Access 52-41-18-000-001 Removal of the APU Exhaust Access-Fairing 317AL 52-41-18-400-001 Installation of the APU Exhaust Access-Fairing 317AL AIPC 49810401080 AIPC 49810401090 AIPC 49814101010 49-81-00-991-002 Fig. 601
3. Job Set-up
__________
Subtask 49-81-00-860-051
A. Aircraft Maintenance Configuration.
(1)
Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
(2)
On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is off.
(3)
Put a warning notice in the cockpit to tell persons not to start the APU.
(4)
Make sure that the hydraulic systems are depressurized (Ref. TASK 29-00-00-864-001).
Subtask 49-81-00-865-056
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
Subtask 49-81-00-010-053
C. Get Access
(1)
Put the access platform in position below the APU access doors 315AL and 316AR.
(2)
Open the APU access doors 315AL 316AR (Ref. TASK 52-41-00-010-001).
(3)
Set the LIGHT control switch 11LJ to the on position.
4. Procedure
_________ (Ref. Fig. 601/TASK 49-81-00-991-002) Subtask 49-81-00-020-053