 the Ground Connector 49-00-00-860-008 APU Start by External Power (131-9(A)) 49-00-00-860-009 APU Shutdown by External Power (131-9(A)) 49-90-00-600-007 Check and Replenish Oil Level (131-9(A)) 52-41-00-010-001 Open the APU Doors for Access

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-91-44Page 405 201-210, Config-2 Aug 01/05
 CES  -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------


52-41-00-410-001 Close the APU Doors after Access
 3. Job Set-up
__________ Subtask 49-91-44-860-063
 A. Aircraft Maintenance Configuration
 (1)
 Energize the ground service network
 (Ref. TASK 24-42-00-861-001).


 (2)
 On the panel 25VU, make sure that the APU MASTER SW p/bsw is OFF.

 (3)
 Make sure that there is a warning notice in the cockpit to tell persons not to start the APU.

 (4)
 Make sure that hydraulic systems are depressurized
 (Ref. TASK 29-00-00-864-001).


 (5)
 Make sure that the access platform is in position below the APU compartment.

 (6)
 Make sure that the APU access doors are open (Ref. TASK 52-41-00-010-001).


 (7)
 Make sure that the LIGHT control SW 11LJ is set to the ON position. Subtask 49-91-44-865-071

 B.
 Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged


 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-91-44Page 406 201-210, Config-2 Aug 01/05
 CES  4. Procedure


_________ Subtask 49-91-44-420-054
 A. Installation of the Oil Cooler
 (1)
 Remove the blanking plugs from the oil cooler and the oil pipes.

 (2)
 Apply a thin layer of lubricant OILS (Material No. 03-002) to the new O-ring (7) and to the new O-ring (12).

 (3)
 Install the new O-rings (7) and (12) on the pipes (9)and (10).

 (4)
 Position the oil cooler (3) and loosely attach it with the captive bolts (1).

 (5)
 Install the oil cooler (3) and tighten the bolts (2).

 (6)
 TORQUE the bolts (2) to between 0.56 and 0.60 m.daN (49.55 and 53.09 lbf.in).

 (7)
 Tighten the captive bolts (1).

 (8)
 TORQUE the bolts (1) to between 0.56 and 0.60 m.daN (49.55 and 53.09 lbf.in)

 (9)
 Install the oil pipes (9) and (10) into the bypass valve (6). NOTE : Make sure that the oil pressure and return pipes are connected


____ to their correct connections in the bypass valve (6).
 (10)
 Turn the pipe retainers (8) and (11) to lock the pipes in the oil cooler.

 (11)
 Tighten the nuts (13).

 (12)
 TORQUE the bolts (13) to between 0.28 and 0.33 m.daN (24.77 and 29.20 lbf.in).

 (13)
 Connect the air outlet duct (5) to the oil cooler (3) with the clamp (4).

 (14)
 TORQUE the clamp (4) to between 0.28 and 0.31 m.daN (24.77 and 27.43 lbf.in).


 NOTE : To prevent damage to the ducts, do not overtighten the clamps
____
 (4).


R  EFF : 001-049, 101-105, 107-107, 151-199, 49-91-44Page 407 201-210, Config-2 Aug 01/05
 CES  Subtask 49-91-44-865-072


 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1KD, 2KD.
 Subtask 49-91-44-710-054
 C. Leak Test
 (1)
 Do a dry run of the APU to circulate oil through the oil cooler. (Ref. TASK 49-00-00-860-008)

 (2)
 Stop the APU (Ref. TASK 49-00-00-860-009).

 (3)
 Add oil to correct level. (Ref. TASK 49-90-00-600-007)

 (4)
 Examine the oil cooler (3) and pipe connections for leaks. No leaks are permitted.


 5. Close-up
________ Subtask 49-91-44-410-058
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Set the LIGHT control SW 11LJ to the OFF position.

 (3)
 Close the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-410-001).


 (4)
 Remove the access platform(s). Subtask 49-91-44-860-064

 B.
 Aircraft Maintenance Configuration


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER 6(122)