 TASK 49-94-13-000-001 Removal of the High Oil-Temperature Switch (8090KM) (GTCP 36-300) WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______
 WHEN YOU DO THE MAINTENANCE TASK(S).

 WARNING : DO NOT LET OIL STAY ON YOUR SKIN FOR A LONG TIME AS IT CAN CAUSE
_______
 INJURY.

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific warning notice
 No specific container 2 l (0.5283 USgal)
 No specific access platform 3.5 m (11 ft. 6 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action
 52-41-00-010-001 Open the APU Doors for Access
 49-94-13-991-001 Fig. 401

 

 3. Job Set-up
__________ Subtask 49-94-13-860-050
 A. Aircraft Maintenance Configuration
 (1)
 Energize the ground service network
 (Ref. TASK 24-42-00-861-001).


 (2)
 On the panel 25VU, make sure that the APU MASTER SW p/bsw is OFF.

 (3)
 Put a warning notice in the cockpit to tell persons not to start the APU.

 (4)
 Make sure that hydraulic systems are depressurized
 (Ref. TASK 29-00-00-864-001).

 

 Subtask 49-94-13-865-050
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 49-94-13-010-050
 C. Get Access
 (1)
 Put the access platform in position below the APU access doors 315AL and 316AR.

 (2)
 Open the APU access doors 315AL and 316AR (Ref. TASK 52-41-00-010-001).

 (3)
 Set the LIGHT SW 11LJ to the ON position.

 


 4. Procedure
_________
 (Ref. Fig. 401/TASK 49-94-13-991-001) Subtask 49-94-13-020-050
 A. Removal of the High Oil-Temperature Switch (8090KM)
 (1)
 Disconnect the electrical connector (1) from the high oil-temperature switch (8090KM) (4).

 (2)
 Put blanking caps on the disconnected electrical connectors.

 (3)
 Put a container in position below the temperature/pressure assembly (6).

 (4)
 Remove the bolt (2) and the washer (3) which attach the high oil-temperature switch (8090KM) (4) to the temperature/pressure assembly (6).

 (5)
 Remove the high oil-temperature switch (8090KM) (4) from the temperature/pressure assembly (6).

 (6)
 Put blanking plugs on the disconnected line ends.

 (7)
 Remove and discard the O-ring (5) from the high oil-temperature switch (8090KM) (4).

 


 Oil Temperature Switch Figure 401/TASK 49-94-13-991-001 
R  EFF :  001-003, 051-099, 401-499,  49-94-13 Page 404 Aug 01/05
 CES 

 

 TASK 49-94-13-400-001
 Installation of the High Oil-Temperature Switch (8090KM) (GTCP 36-300)

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific container 2 l (0.5283 USgal)
 No specific access platform 3.5 m (11 ft. 6 in.)
 No specific Torque Wrench : range 0.00 to 1.20 m.daN

 (0.00 to 9.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
 