Set the LIGHT control switch 11LJ to the OFF position.
(3)
Close the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-410-001).
(4)
Remove the access platform(s). Subtask 49-94-00-865-066
B.
Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1KD, 2KD
Subtask 49-94-00-860-069
C. Aircraft Maintenance Configuration
(1)
De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
(2)
Pressurize the reservoirs of the hydraulic systems. (Ref. TASK 29-14-00-614-002).
(3)
Remove the warning notice(s).
TASK 49-94-00-400-001
Installation of the Oil Pressure/Temperature Assembly (GTCP 36-300)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific warning notice
No specific container 2 l (0.5283 USgal)
No specific access platform 3.5 m (11 ft. 6 in.)
No specific Torque Wrench : range 0.00 to 1.20 m.daN
(0.00
to 9.00 lbf.ft) No specific Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
B.
Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 03-002 GB DEF-STAN 91-101 LUBRICATING OIL TURBINE ENGINE SYNT BASE (Ref. 20-31-00)
Material No. 19-010 USA AMS 5687 LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA (Ref. 20-31-00)
Material No. 19-018 USA AMS 5687 LOCKWIRE 0.6 MM (Ref. 20-31-00)
C. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
1 packing 49-94-04 01A-110 13 packing 49-94-04 01A-140
D. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
the Ground Connector 49-90-00-600-001 Check Oil Level and Replenish (GTCP 36-300) 52-41-00-010-001 Open the APU Doors for Access 52-41-00-410-001 Close the APU Doors after Access
3. Job Set-up
__________
Subtask 49-94-00-860-060
A. Aircraft Maintenance Configuration
(1)
On the panel 25VU make sure that the APU MASTER SW pushbutton switch is off.
(2)
Make sure that there is a warning notice in the cockpit to tell persons not to start the APU.
(3)
Make sure that ground fire extinguishing equipment is available.
(4)
Make sure that hydraulic systems are depressurized
(Ref. TASK 29-00-00-864-001).
(5)
Make sure that the access platform is in position below the APU compartment.
(6)
Make sure that the APU access doors are open (Ref. TASK 52-41-00-010-001).
(7)
Make sure that the container is in position below the oil pressure/temperature assembly (7).
Subtask 49-94-00-865-067
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
Subtask 49-94-00-010-058
C. Get Access
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER 6(170)