• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 14:47来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (3)
 Set the LIGHT SW 11LJ to the ON position.

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-93-16Page 402 201-210, Config-2 Aug 01/05
 CES  4. Procedure


_________
 (Ref. Fig. 401/TASK 49-93-16-991-002) Subtask 49-93-16-020-051
 A. Removal of the Oil Level Switch
 (1)
 Disconnect the electrical connector (1) from the oil level switch (2).

 (2)
 Put blanking caps on the disconnected electrical connectors.

 (3)
 Loosen the bolt (4) and rotate the switch (2) to release it.

 (4)
 Pull the switch out of the filling port (5).

 (5)
 Remove and discard the O-ring (3).

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-93-16Page 403 201-210, Config-2 Aug 01/05
 CES


 Oil Level Switch
 Figure 401/TASK 49-93-16-991-002

 CES


 TASK 49-93-16-400-003
 Installation of Oil Level Switch (8087KM) (131-9(A))

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  Torque Wrench : range 0.00 to 1.20 m.daN
 (0.00 to 9.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 03-002  GB DEF-STAN 91-101 LUBRICATING OIL TURBINE ENGINE SYNT BASE (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
O-ring  49-93-09 01 -030

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-93-16Page 405 201-210, Config-2 Aug 01/05
 CES


 D. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
 the Ground Connector 49-00-00-860-008 APU Start by External Power (131-9(A)) 49-00-00-860-009 APU Shutdown by External Power (131-9(A)) 49-90-00-600-007 Check and Replenish Oil Level (131-9(A)) 52-41-00-010-001 Open the APU Doors for Access 52-41-00-410-001 Close the APU Doors after Access 49-93-16-991-002 Fig. 401
 3. Job Set-up
__________
 Subtask 49-93-16-865-057
 A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 49-93-16-860-054
 B. Aircraft Maintenance Configuration
 (1)
 Energize the ground service network
 (Ref. TASK 24-42-00-861-001).


 (2)
 On the panel 25VU make sure that the APU MASTER SW p/bsw is OFF.

 (3)
 Make sure that there is a warning notice in the cockpit to tell persons not to start the APU.

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-93-16Page 406 201-210, Config-2 Aug 01/05
 CES


 (4)
 Make sure that hydraulic systems are depressurized
 (Ref. TASK 29-00-00-864-001).


 (5)
 Make sure that the access platform is in position below the APU compartment.

 (6)
 Make sure that the APU access doors are open (Ref. TASK 52-41-00-010-001).

 (7)
 Make sure that the LIGHT SW 11LJ is set to the ON position.


 4. Procedure
_________
 (Ref. Fig. 401/TASK 49-93-16-991-002) Subtask 49-93-16-420-051
 A. Installation of the Oil Level Switch
 (1)
 Apply a thin layer of lubricant OILS (Material No. 03-002) to the new O-ring (3).

 (2)
 Install the new O-ring (3) on the switch (2).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER 6(162)