• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 14:47来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (3)
 Remove the bolts (2) and remove the de-oiling solenoid valve (3).

 (4)
 Install a blank plug in the gearbox.

 (5)
 Remove and discard the packings (4) and (5) from the de-oiling solenoid valve (3).

 


 De-oiling Solenoid Valve
 Figure 401/TASK 49-91-49-991-002

 CES  TASK 49-91-49-400-002 Installation of the De-oiling Solenoid Valve (8083KM) (APS 3200) WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS


_______ WHEN YOU DO THE MAINTENANCE TASK(S).
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  Torque Wrench : range 36.00 to 220.00 lbf.in
 (0.40 to 2.60 m.daN)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 03-002  GB DEF-STAN 91-101 LUBRICATING OIL TURBINE ENGINE SYNT BASE (Ref. 20-31-00)
 Material No. 04-012  USA VV-P-236 PURE MINERALVASELINE OR PETRO- LATUM (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
4 packing 49-91-04 52A-030 5 packing 49-91-04 52A-040


 D. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
 the Ground Connector 49-00-00-710-008 Operational Test of the APU (APS 3200) 52-41-00-010-001 Open the APU Doors for Access 52-41-00-410-001 Close the APU Doors after Access 49-91-49-991-002 Fig. 401
 3. Job Set-up
__________
 Subtask 49-91-49-860-050
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the aircraft electrical circuits are energized (Ref. TASK 24-41-00-861-002).

 (2)
 On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is off.

 (3)
 Make sure that there is a warning notice in the cockpit to tell persons not to start the APU.

 (4)
 Make sure that hydraulic systems are depressurized
 (Ref. TASK 29-00-00-864-001).


 (5)
 Make sure that the access platform is in position below the APU compartment.

 (6)
 Make sure that the APU access doors are open (Ref. TASK 52-41-00-010-001).

 (7)
 Make sure that the LIGHT control switch 11LJ is set to the on position.

 


 Subtask 49-91-49-865-056
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 4. Procedure
_________
 (Ref. Fig. 401/TASK 49-91-49-991-002) Subtask 49-91-49-420-051
 A. Installation of the De-oiling Solenoid Valve
 (1)
 Apply COMMON GREASE (Material No. 04-012) to the new packing (4) and packing (5).

 (2)
 Install the new packings (4) and (5) on the de-oiling solenoid valve (3).

 (3)
 Lubricate the bolts (2) with OILS (Material No. 03-002).

 (4)
 Install the de-oiling solenoid valve (3) with the bolts (2).

 (5)
 TORQUE the two bolts (2) to between 46 and 51 lbf.in (0.51 and 0.57 m.daN).

 (6)
 Remove the blanking caps from the electrical connectors.

 (7)
 Make sure that the electrical connectors are clean and in the correct condition.

 (8)
 Connect the electrical connector P15 (1) to the de-oiling solenoid valve (3).


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER 6(146)