 (GTCP 36-300) 49-90-00-600-001 Check Oil Level and Replenish (GTCP 36-300) 52-41-00-010-001 Open the APU Doors for Access 52-41-00-410-001 Close the APU Doors after Access
 3. Job Set-up
__________
 Subtask 49-91-45-860-052
 A. Aircraft Maintenance Configuration
 (1)
 Energize the ground service network
 (Ref. TASK 24-42-00-861-001).


 (2)
 On the panel 25VU make sure that the APU MASTER SW p/bsw is OFF.

 (3)
 Make sure that there is a warning notice in the cockpit to tell persons not to start the APU.

 (4)
 Make sure that hydraulic systems are depressurized
 (Ref. TASK 29-00-00-864-001).

 

 

 Subtask 49-91-45-865-051
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 49-91-45-010-054
 C. Get Access
 (1)
 Put the access platform in position below the APU access doors 315AL and 316AR.

 (2)
 Open the APU access doors 315AL and 316AR (Ref. TASK 52-41-00-010-001).

 (3)
 Set the LIGHT SW 11LJ to the ON position.


 4. Procedure
_________ Subtask 49-91-45-420-056
 A. Installation of the Oil Pump (8080KM)
 (1)
 Remove items from the old pump and install them to the new pump.

 (a)
 The pressure (1) and return (2) check valves that connect the pipes (19) and (20) with the pump assembly (8080KM) (11).

 (b)
 The elbow connection (4) that connects the pipe (7) with the oil pump assembly (8080KM) (11).

 (c)
 The blanking plug (10) in the lube-pump filter upper-housing.

 

 (2)
 Remove the blanking plugs from the oil pump assembly and the disconnected line ends.

 (3)
 Apply a thin layer of OILS (Material No. 03-002) to the new O-rings (6).

 (4)
 Install the new O-rings (6) on the transfer pipe (5).

 (5)
 Install the transfer pipe (5) to the oil pump assembly (8080KM) (11).

 (6)
 Apply a thin layer of OILS (Material No. 03-002) to the new O-rings (9).

 (7)
 Install the new O-rings (9) on the transfer pipe (8).

 (8)
 Install the transfer pipe (8) to the oil pump assembly (8080KM) (11).

 (9)
 Apply a thin layer of OILS (Material No. 03-002) to the new O-ring
 (3).

 

 

 (10)
 Install the new O-ring (3) to the oil pump assembly (8080KM) (11).

 (11)
 Install the oil pump assembly (8080KM) (11) to the APU gearbox. NOTE : Make sure that there is no clearance between the gearbox and

____
 the oil pump assembly flange when installed.


 (12)
 Install the cable bracket to the upper right bolt position.

 (13)
 Install the washers (15) and the bolts (14) to the oil pump assembly (8080KM) (11).

 (14)
 TORQUE the bolts (14) to between 0.56 and 0.79 m.daN (49.55 and 69.91 lbf.in).

 (15)
 Apply a thin layer of OILS (Material No. 03-002) to the new O-ring (16).

 (16)
 Install the new O-ring (16) on the pipe (17).

 (17)
 Install the pipe (17) to the oil pump assembly (8080KM) (11) with the bolt (18).

 (18)
 Install the pipes (7), (19), (20) and (12) to the oil pump assembly (8080KM) (11).

 (19)
 TORQUE the B-nut on tube (7) to to between 2.43 and 3.16 m.daN (17.92 and 23.30 lbf.ft).

 (20)
 TORQUE the B-nut on tube (12) to to between 5.31 and 6.22 m.daN

 (39.15 and 45.87 lbf.ft).

 (21)
 TORQUE the B-nut on tube (19) to to between 7.01 and 8.42 m.daN

 (51.69 and 62.09 lbf.ft).

 (22)
 TORQUE the B-nut on tube (20) to to between 9.66 and 11.92 m.daN

 (71.23 and 87.90 lbf.ft).

 (23)
 Install the fuel control unit (8022KM) (13) (Ref. TASK 49-32-11-400-001).

 


 Subtask 49-91-45-210-050
 B. Do a visual check of the oil quantity. Add oil if the oil level is on or less than the ADD mark on the sight glass. (Ref. TASK 49-90-00-600-001).
 Subtask 49-91-45-865-052
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1KD, 2KD.
 Subtask 49-91-45-710-050
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER 6(135)