• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-06 23:18来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

_______________________________
 1.  General_______
 A.  This procedure has instructions to do an inspection of the check valves in the equipment cooling system. One check valve is installed adjacent to each equipment cooling fan.
 TASK 21-58-03-206-001
 2.  Check Valve Inspection______________________
 A.  References
 (1)  
AMM 21-58-03/401, Fan Check Valves

 (2)  
IPC 21-43-52 Fig. 2

 (3)  
IPC 21-58-03 Fig. 1


 B.  Access
 (1)  Location Zone 121 Forward Cargo Compartment Forward Half, LH 122 Forward Cargo Compartment Forward Half, RH
 C.  Do the Inspection
 S 026-002
 (1)  
Remove the check valve (AMM 21-58-03/401).

 S 216-003

 (2)
Look at the check valve to make sure it has these conditions:

 (a)  
All of the parts are there

 (b)  
The housing does not have a crack or corrosion

 (c)  
The mating (sealing) surfaces of the flappers and the valve body are not worn or damaged.

 (d)  
The flappers move easily.

 


 S 966-005
 (3)  
If the check valve does not have one of these conditions, replace the check valve.

 (4)  
Install the check valve (AMM 21-58-03/401).


 S 426-004
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-58-03
 ALL  ú ú 01 Page 601 ú Oct 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 NINE-INCH DUCT VALVE - REMOVAL/INSTALLATION
___________________________________________
 1.  General_______
 A.  The nine-inch duct valves are the valves in the equipment cooling system that are nine inches in diameter. They are:
 (1)
The inboard supply valve

 (2)
The inboard exhaust valve

 (3)
The bypass valve.


 B.  This procedure has the tasks that follow:
 (1)
Nine-Inch Duct Valve Removal

 (2)
Nine-Inch Duct Valve Installation

 (3)
Inboard Exhaust Valve Actuator Removal

 (4)
Inboard Exhaust Valve Actuator Installation


 C.  The inboard supply valve and the bypass valve are installed in the left sidewall of the forward cargo compartment at Station 580. The inboard exhaust valve is installed below the floor of the forward cargo compartment at station 560.
 TASK 21-58-04-004-001
 2.  Nine-Inch Duct Valve Removal (Fig. 401)____________________________
 A.  References
 (1)
24-22-00/201, Manual Control

 (2)  
25-52-01/401, Containerized Cargo Compartment Ceiling and Sidewall Linings

 (3)
IPC 21-58-04 Fig. 2

 (4)
IPC 21-58-04 Fig. 3

 (5)
WDM 21-58-12, 21-58-13

 (6)
SSM 21-58-03


 B.  Access
 (1)  Location Zone 121 Forward Cargo Compartment Forward Half, LH
 C.  Prepare for the Removal
 S 864-002
 CAUTION: DO NOT OPERATE THE ELECTRICAL/ELECTRONIC EQUIPMENT WHEN YOU DO
_______ THIS PROCEDURE. IF YOU OPERATE THE ELECTRICAL EQUIPMENT WHEN THE EQUIPMENT COOLING SYSTEM IS OFF, YOU COULD CAUSE THE ELECTRICAL EQUIPMENT TO BECOME TOO HOT.
 (1) Remove the electrical power (Ref 24-22-00/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-58-04
 ALL  ú ú 03 Page 401 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

747-400
MAINTENANCE MANUAL

GROUND 
EXHAUST 
DUCT 
SEE  B 
EQUIPMENT 
SEE  A  COOLING  INBOARD EXHAUST 
EXHAUST  VALVE 
SEE  C 
FWD 
BYPASS 
DUCT 

SUPPLY VALVE 
SEE  E 

SUPPLY FAN SMOKE/OVERRIDE (REF) VALVE (REF)
BYPASS VALVE
STA STA  STA
FWD
580 SEE D 560  540
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 空调 AIR CONDITIONING 2(91)