747-400
MAINTENANCE MANUAL

RAM AIR DUCT
RAM AIR DUCT
ACCESS DOOR HEADER
BOLTS 
(20 LOCATIONS) 
WATER 
ASPIRATOR 
TUBE 
SEE  A 
CAP ASSEMBLY  CLAMP 
(4 LOCATIONS) 
SECONDARY SIDE OF HEAT EXCHANGER  CONNECTOR  A 
HEAT EXCHANGER 
CAP  PRIMARY SIDE OF 
ASSEMBLY  HEAT EXCHANGER 
OPEN TO AMBIENT 

1  REQUIRED FOR FLOW RATE LEAKAGE TEST 
WATER ASPIRATOR BOSS CAPPED  PRIMARY  FLOWMETER  1 
GAGE  GAGE 
VALVE 
TEST EQUIPMENT SCHEMATIC SECONDARY CAP ASSEMBLY (GS13264-4)  AIR SUPPLY 
Heat Exchanger Check Figure 601 

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-51-03
 ALL  ú ú 01 Page 602 ú Jun 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 D. Do the Check
 S 216-004
 (1)  
Make sure there is no unwanted material near the face of the heat exchanger.

 S 216-049

 (2)  
Make sure that less than 5% of the fins on the face of the heat exchanger are bent.

 S 216-005

 (3)  
Make sure there are no cracks that you can see in the welds of the heat exchanger.

 S 216-080

 (4)  
Make sure that there is no corrosion on the secondary heat exchanger outlet flange.

 S 216-006

 (5)
Make sure there are no cracks or dents in the ram-air header.


 E. Put the Airplane to Its Usual Condition
 S 416-007
 (1)  
Install the access door in the ram-air duct.

 S 416-008

 (2)  
Close the applicable access panel 191E-L, 192E-R or 191M-L (Ref 06-09-03/201).


 TASK 21-51-03-706-009
 3. Heat Exchanger Leak Test (Fig. 601)
________________________
 A. Special Tools and Equipment
 (1)  GS13264-4 - Cap assembly (2 required) Hamilton Standard, Windsor Locks, Connecticut
 B. Consumable Materials
 (1)  75400078 - Seals (2 required) Purolator Products Inc., Aerospace Division, Newbury Park, California
 C. Standard Tools and Equipment
 (1)  
Pressure gage - 0 to 100 psig (0 to 750 kPa gage) (2 required)

 (2)  
Flowmeter - 0.8 to 4.2 pounds per minute (Flow Rate Leak Test only)

 (3)  
Regulated filtered air or nitrogen supply, 65 psig (450 kPa gage) minimum

 (4)  
Stop watch (Pressure Decay Leak Test only)


 D. References
 (1)  
06-09-03/201, Body Section 44 Access Doors and Panels

 (2)  
21-51-03/401, Heat Exchanger

 (3)  
21-51-11/401, Water Aspirator

 (4)  
36-11-01/401, Pneumatic Manifold

 (5)  
IPC 21-51-03 Fig. 2


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-51-03
 ALL  ú ú 01 Page 603 ú Jun 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 E. Access
 (1)  
Location Zone
 133 Air Conditioning Equipment Bay, LH
 134 Air Conditioning Equipment Bay, RH


 (2)  
Access Panel
 191E-L Air Conditioning Access Panel
 192E-R Air Conditioning Access Panel
 191M-L Air Conditioning Access Panel

 

 F. Prepare for the Leak Test
 S 016-010
 (1)  
Open the applicable access panel 191E-L, 192E-R, or 191M-L
 (Ref 06-09-03/201).


 S 036-011

 (2)  
Remove the water aspirator from the heat exchanger
 (Ref 21-51-11/401).


 S 436-012

 (3)  
Install a plug in the aspirator boss on the heat exchanger.

 S 016-014

 (4)  
Remove the ducts that are connected to the heat exchanger inlets and outlets (4 locations) (Ref 36-11-01/401).


 