21-51-01
 ALL  ú ú 03 Page 405 ú Jun 18/01 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL
 S 714-019
 (4)  Make sure the valve is open.
 NOTE: The manual override knob shows the position of the valve.
____
 S 794-020
 (5)  Feel for leaks around the valve.
 (a)  
Small leaks are permitted.
 (b)  
You must repair a large leak.
 G. Put the airplane to its usual condition.
 S 414-032
 (1)  
Close the applicable access door, 191H-L, 191N-L, 192N-R
 (AMM 06-09-03/201).
 S 864-021
 (2)  
Turn the applicable PACK selector, on the P5 panel, to the OFF position.
S 864-031
 (3)  
Release the pressure in the pneumatic system, if it is not necessary (AMM 36-00-00/201).
S 864-023
 (4)  
Remove the electrical power, if it is not necessary
 (AMM 24-22-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 21-51-01
 ALL  ú ú 03 Page 406 ú Jun 18/01 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL
 FLOW CONTROL AND SHUTOFF VALVE - ADJUSTMENT/TEST
________________________________________________
 1.  General
 A.  This procedure has instructions to do a functional test of the flow control and shutoff valves. A flow control and shutoff valve is installed at the aft end of each air cooling pack.
 TASK 21-51-01-705-001
 2.  Flow Control and Shutoff Valve Test (Fig. 501)___________________________________
 A.  Special Tools and Equipment
 (1)  
Valve Tester - GS9400-5 (Hamilton Standard, Windsor Locks, Conn.) Make sure the tester includes these parts:
 -GS8967-1, Cable Assembly
 -GS8967-9, Cable Assembly
 -AD30008-1, Hose Assembly
 -AD30008-3, Hose Assembly
 (2)  
Test Plugs - GS13237-1 and GS13238-1 (Hamilton Standard, Windsor Locks, Conn.)
 (3)  
Air or Nitrogen supply - 130 to 150 psi (900 to 1000 kPa) (commercially available)
 B.  References
 (1)  
AIPC 21-51-00, Fig. 5
 (2)  
AIPC 21-51-00 Fig. 5A
 (3)  
AIPC 21-51-00, Fig. 6
 (4)  
AIPC 21-51-00 Fig. 6A
 (5)  
AIPC 21-51-00, Fig. 7
 (6)  
AIPC 21-51-00 Fig. 7A
 (7)  
AMM 20-11-28/401, Lockwire
 (8)  
AMM 06-09-03/201, Body Section 44 Access Doors and Panels
 (9)  
AMM 21-00-00/201, Air Conditioning
 (10)
 AMM 36-00-00/201, Pneumatic System
 (11)
 WDM 21-51-11
 (12)
 WDM 21-51-12
 (13)
 WDM 21-51-13
 (14)
 SSM 21-51-01
 C.  Access
 (1)  
Location Zone
 133 Air Conditioning Equipment Bay, LH
 134 Air Conditioning Equipment Bay, RH
 (2)  
Access Panel
 191H-L Air Conditioning Access Door
 191N-L Air Conditioning Access Door
 192H-R Air Conditioning Access Door
 D.  Prepare for the Test
 S 865-026
 (1)  Release the pressure from the pneumatic system (AMM 36-00-00/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 21-51-01
 ALL  ú ú 02 Page 501 ú Jun 18/01 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A
747-400 
MAINTENANCE MANUAL
ELECTRICAL  
CONNECTOR  
PORT NO.  FUNCTION  
G1  SUPPLY  
PRESSURE - GSE  
G2  SIGNAL  
PRESSURE - GSE  
G1 TEST  
PORT PLUG  
G2 TEST  
PORT PLUG 
FLOW CONTROL VALVE TEST PORT AND SHUTOFF PLUG TEST CONNECTOR TEST SET HOSE ASSEMBLY 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:747-400 AMM 飞机维护手册 空调 AIR CONDITIONING 2(7)