21-51-01
ALL ú ú 03 Page 405 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
S 714-019
(4) Make sure the valve is open.
NOTE: The manual override knob shows the position of the valve.
____
S 794-020
(5) Feel for leaks around the valve.
(a)
Small leaks are permitted.
(b)
You must repair a large leak.
G. Put the airplane to its usual condition.
S 414-032
(1)
Close the applicable access door, 191H-L, 191N-L, 192N-R
(AMM 06-09-03/201).
S 864-021
(2)
Turn the applicable PACK selector, on the P5 panel, to the OFF position.
S 864-031
(3)
Release the pressure in the pneumatic system, if it is not necessary (AMM 36-00-00/201).
S 864-023
(4)
Remove the electrical power, if it is not necessary
(AMM 24-22-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-51-01
ALL ú ú 03 Page 406 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
FLOW CONTROL AND SHUTOFF VALVE - ADJUSTMENT/TEST
________________________________________________
1. General
A. This procedure has instructions to do a functional test of the flow control and shutoff valves. A flow control and shutoff valve is installed at the aft end of each air cooling pack.
TASK 21-51-01-705-001
2. Flow Control and Shutoff Valve Test (Fig. 501)___________________________________
A. Special Tools and Equipment
(1)
Valve Tester - GS9400-5 (Hamilton Standard, Windsor Locks, Conn.) Make sure the tester includes these parts:
-GS8967-1, Cable Assembly
-GS8967-9, Cable Assembly
-AD30008-1, Hose Assembly
-AD30008-3, Hose Assembly
(2)
Test Plugs - GS13237-1 and GS13238-1 (Hamilton Standard, Windsor Locks, Conn.)
(3)
Air or Nitrogen supply - 130 to 150 psi (900 to 1000 kPa) (commercially available)
B. References
(1)
AIPC 21-51-00, Fig. 5
(2)
AIPC 21-51-00 Fig. 5A
(3)
AIPC 21-51-00, Fig. 6
(4)
AIPC 21-51-00 Fig. 6A
(5)
AIPC 21-51-00, Fig. 7
(6)
AIPC 21-51-00 Fig. 7A
(7)
AMM 20-11-28/401, Lockwire
(8)
AMM 06-09-03/201, Body Section 44 Access Doors and Panels
(9)
AMM 21-00-00/201, Air Conditioning
(10)
AMM 36-00-00/201, Pneumatic System
(11)
WDM 21-51-11
(12)
WDM 21-51-12
(13)
WDM 21-51-13
(14)
SSM 21-51-01
C. Access
(1)
Location Zone
133 Air Conditioning Equipment Bay, LH
134 Air Conditioning Equipment Bay, RH
(2)
Access Panel
191H-L Air Conditioning Access Door
191N-L Air Conditioning Access Door
192H-R Air Conditioning Access Door
D. Prepare for the Test
S 865-026
(1) Release the pressure from the pneumatic system (AMM 36-00-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-51-01
ALL ú ú 02 Page 501 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
ELECTRICAL
CONNECTOR
PORT NO. FUNCTION
G1 SUPPLY
PRESSURE - GSE
G2 SIGNAL
PRESSURE - GSE
G1 TEST
PORT PLUG
G2 TEST
PORT PLUG
FLOW CONTROL VALVE TEST PORT AND SHUTOFF PLUG TEST CONNECTOR TEST SET HOSE ASSEMBLY 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:747-400 AMM 飞机维护手册 空调 AIR CONDITIONING 2(7)