• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-06 23:18来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 191N-L Air Conditioning Access Door
 192H-R Air Conditioning Access Door

 

 C.  Prepare for the Test
 S 015-002
 (1)  Open the applicable access door (AMM 06-09-03/201):
 -191N-L for pack 1 or 2
 -192H-R for pack 3
 D.  Do the Water Aspirator Test
 S 035-006
 (1)  
Disconnect the water drain hose from the water separator (AMM 21-51-05/201).

 (2)  
Operate the applicable air conditioning pack (AMM 21-00-00/201).


 S 865-007
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-51-11
 ALL  ú ú 01 Page 501 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 715-008
 (3)  Make sure the air flows into the water drain hose.
 NOTE: You can put the hose against your forearm or against the
____
 side of your face to feel the airflow.

 E. Put the airplane to its usual condition
 S 865-013
 (1)  
Do the procedure to stop the air conditioning pack
 (AMM 21-00-00/201).


 S 435-009

 (2)  
Install the water drain hose on the water separator
 (AMM 21-51-05/201).


 S 415-010

 (3)  
Close the applicable access door (AMM 06-09-03/201):


 -191N-L for pack 1 or 2
 -192H-R for pack 3
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-51-11
 ALL  ú ú 01 Page 502 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 RAM AIR HEADER DUCT - REMOVAL/INSTALLATION
__________________________________________
 1.  General_______
 A.  This procedure has instructions to remove and install the ram air header duct. A ram air header duct is installed in each air cooling pack.
 TASK 21-51-12-004-001
 2.  Ram Air Header Duct Removal (Fig. 401)___________________________
 A.  References
 (1)  
AIPC 21-62-56 Fig. 1 and 2

 (2)  
AMM 21-51-03/401, Heat exchanger

 (3)  
AMM 21-51-11/401, Water Aspirator


 B.  Access
 (1)  
Location Zone
 133 Air Conditioning Equipment Bay, LH
 134 Air Conditioning Equipment Bay, RH


 (2)  
Access Panel
 191E-L Air Conditioning Access Panel
 191M-L Air Conditioning Access Panel
 192E-R Air Conditioning Access Panel

 

 C.  Procedure
 S 014-006
 (1)  
Remove the heat exchanger (AMM 21-51-03/401).

 S 014-055

 (2)  
Disconnect the water aspirator fitting from the heat exchanger and the header duct (1 tube and 1 hose) (AMM 21-51-11/401).

 S 014-046

 (3)  
Remove the bolts, nuts and washers (16 locations) that connects the header duct to the check valve.

 S 024-050

 (4)  
Remove the aft most clamp that connects the header duct to the fan diffuser and inlet housing (fan housing) of the air cycle machine.

 (5)  
Move the ram air header duct aft and down.


 S 024-054
 TASK 21-51-12-404-025
 3.  Ram Air Header Duct Installation (Fig. 401)________________________________
 A.  References
 (1)  AIPC 21-62-56 Fig. 1 and 2
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-51-12
 ALL  ú ú 01 Page 401 ú Oct 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

AIR CONDITIONING EQUIPMENT BAY
SEE A
PACK 2 RAM AIR HEADER DUCT
SEEB C
SEE B C HEADER DUCT PACK 1 RAM AIR 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 空调 AIR CONDITIONING 2(39)