21-51-00
 ALL  ú ú 01 Page 603 ú Oct 10/96 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL
 FLOW CONTROL AND SHUTOFF VALVE - REMOVAL/INSTALLATION
_____________________________________________________
 1.  General_______
 A.  This procedure has instructions to remove and install the flow control and shutoff valves. A flow control and shutoff valve is installed aft of each air cooling pack.
 TASK 21-51-01-004-001
 2.  Flow Control and Shutoff Valve Removal (Fig. 401)______________________________________
 A.  References
 (1)  
AMM 06-09-03/201, Body Section 44 Access Doors and Panels
 (2)  
AMM 36-00-00/201, Pneumatic System
 (3)  
AIPC 21-51-00 Fig. 5
 (4)  
AIPC 21-51-00 Fig. 5A
 (5)  
AIPC 21-51-00 Fig. 6
 (6)  
AIPC 21-51-00 Fig. 6A
 (7)  
AIPC 21-51-00 Fig. 7
 (8)  
AIPC 21-51-00 Fig. 7A
 (9)  
WDM 21-51-11, 21-51-12, 21-51-13
 (10)
 SSM 21-51-01
 B.  Access
 (1)  
Location Zone
 133 Air Conditioning Equipment Bay, LH
 134 Air Conditioning Equipment Bay, RH
 (2)  
Access Panel
 191H-L Air Conditioning Access Door
 191N-L Air Conditioning Access Door
 192H-R Air Conditioning Access Door
 C.  Prepare for the Removal
 S 864-002
 (1) Release the pressure in the pneumatic system (AMM 36-00-00/201).
 (a)  Make sure the DUCT PSI L and R, on the EICAS ECS synoptic display, are less than 0.50.
 S 864-030
 (2)  Turn the applicable PACK selector, on the overhead panel, P5, to the OFF position.
 (a)  Put a DO-NOT-OPERATE tag on the selector.
 S 014-003
 (3)  Open the applicable access door (AMM 06-09-03/201):
 (a)  191H-L for pack 1.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 21-51-01
 ALL  ú ú 02 Page 401 ú Jun 18/01 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 
MAINTENANCE MANUAL
PACK 2 FLOW CONTROL PACK 1 FLOW CONTROL AND SHUTOFF VALVE AND SHUTOFF VALVE 
SEE A SEE A 
ELECTRICAL A 
CONNECTOR 
A 
PACK 3BONDING FLOW CONTROLJUMPERS 
AND SHUTOFF FWD VALVE 
SEE A
AIR CONDITIONING EQUIPMENT BAY 
FLOW CONTROL SEE BAND SHUTOFF VALVE
SEE B 
A 
MANUAL ARM (SHOWN OVERRIDE IN CLOSEDV-BAND CLAMP POSITION) 
DUCT 
SEAL ASSEMBLY 
B 
A-A 
Flow Control and Shutoff Valve Installation 
Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 21-51-01
 ALL  ú ú 01 Page 402 ú Oct 10/89 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL
 (b) 
191N-L for pack 2.
 (c) 
192H-R for pack 3.
 D. Remove the Valve
 S 034-005
 (1) 
Disconnect the electrical connector from the valve.
S 034-006
 (2) 
Remove the bonding jumpers from the valve.
S 034-009
 (3) 
Remove the clamps from each end of valve.
 NOTE: You can use a plastic mallet to loosen the clamp.
____
 S 024-010
 (4) 
Remove the valve.
S 434-026
 (5) 
Put a cover on the duct openings.
 TASK 21-51-01-404-011
 3. Flow Control and Shutoff Valve Installation (Fig. 401)
___________________________________________
 A. References
 (1) 
AMM 06-09-03/201, Body Section 44 Access Doors and Panels
 (2) 
AMM 20-11-14/701, Metal Surfaces - Cleaning/Painting
 (3) 
AMM 20-22-01/601, Electrical Bonding
 (4) 
AMM 24-22-00/201, Manual Control
 (5) 
AMM 36-00-00/201, Pneumatic System
 (6) 
AIPC 21-51-00 Fig. 5
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 空调 AIR CONDITIONING 2(5)