21-58-01
ALL ú ú 02F Page 410 ú Feb 15/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
(2)
AMM 25-57-04/401, Roller/Caster Trays
(3)
AMM 25-58-01/401, Lock/Stop Roller/Caster Trays
(4)
AMM 25-58-03/401, Vertical and Side Restraint/Caster Unit
(5)
AMM 53-21-02/401, Main and Upper Deck Floor
(6)
AIPC 21-58-01 Fig. 1
(7)
AIPC 21-58-01 Fig. 2
(8)
SSM 21-58-07
(9)
WDM 21-58-26
B. Access
(1) Location Zone
151 Area Aft of Bulk Cargo Compartment, LH
C. Procedure
S 034-049
(1)
Remove the covers from the duct openings.
S 424-050
(2)
Put the fan in its position.
(a) Make sure the flow arrow points in the inboard direction.
S 434-051
(3)
Install the two clamps that attach the fan to the airplane structure.
S 434-052
(4)
Pull the sleeve with the air outlet tube onto the inboard (outlet) side of the fan.
S 434-053
(5)
Pull the sleeve onto the outboard (inlet) side of the fan.
S 434-054
(6)
Install the two clamps that attach the sleeves to both ends of the fan.
S 434-055
(7)
Install the electrical connector to the fan.
(a)
Primary fan, DB8599
(b)
Alternate fan, DB8598
S 864-056
(8) Remove the "DO-NOT-CLOSE" identifiers and close these circuit breakers:
(a) Main power distribution panel, P6
1) 6H30, AFT EQUIP COOL FAN CONT
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-58-01
ALL ú ú 02F Page 411 ú Feb 15/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(b) P84 Panel
1) PRI AFT EQUIP COOL FAN PWR
2) ALT AFT EQUIP COOL FAN PWR
D. Do a Check of the Fan Installation
S 864-057
(1)
Supply electrical power (AMM 24-22-00/201).
S 714-058
(2)
Do these steps for the primary fan:
(a)
Make sure the fan operates.
(b)
Make sure there are no large leaks in the fan to duct connections.
S 714-059
(3) Do these steps for the alternate fan:
(a)
Open this circuit breaker on the P84 panel:
1) PRI AFT EQUIP COOL FAN PWR
(b)
Make sure that within 15 seconds the alternate aft fan operates.
NOTE: Ther primary fan will stop.
____
(c)
Make sure there are no large leaks in the fan to duct connections.
(d)
Close this P84 panel circuit breaker:
1) PRI AFT EQUIP COOL FAN PWR
E. Put the Airplane Back to its usual Condition
S 414-060
(1) Do these steps if you removed the floor panels to get access to the fans:
(a)
Install the floor panel that you removed (AMM 53-21-02/401).
(b)
Install the following cargo handling equipment on the floor panels: 1) Roller/Caster Trays (AMM 25-57-04/401) 2) Lock/Stop Roller/Caster Trays (AMM 25-58-01/401) 3) Vertical and Side Restraint/Caster Unit (AMM 25-58-01/401)
S 864-061
(2) Remove the electrical power if it is not necessary
(AMM 24-22-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-58-01
ALL ú ú 01F Page 412 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 空调 AIR CONDITIONING 2(85)