• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-06 23:18来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 C. Install the Overheat Switch
 S 422-035
 (1)
Put a new O-ring on the overheat switch.

 (2)
Use two wrenches to install the overheat switch in the duct.


 S 422-010
 NOTE: Use one wrench to hold the boss and the other wrench to
____
 turn the overheat switch.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-51-09
 ALL  ú ú 01 Page 203 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 422-031
 (3)
Install a lockwire on the overheat switch (AMM 20-11-28/401).

 S 422-032

 (4)  
Connect the applicable electrical connector to the overheat switch:


 -DS520 for pack 1
 -DS517 for pack 2
 -DS522 for pack 3
 D. Put the airplane to its usual condition
 S 412-013
 (1)  
Close the applicable access door, 191A-L, 192A-R, or 191H-L (AMM 06-09-03/201).

 S 862-014

 (2)  
Remove the DO-NOT-CLOSE tag and close the applicable circuit breaker, on the P180 DC Power Distribution Panel:

 (a)  
180J2, PACK 1 PROT

 (b)  
180F2, PACK 2 PROT

 (c)  
180J17, PACK 3 PROT

 


 S 862-015
 (3)  Remove the DO-NOT-OPERATE tag from the applicable PACKS selector, on the P5 panel.
 TASK 21-51-09-702-016
 4.  Compressor Discharge Overheat Switch Test (Fig. 201)_________________________________________
 A. General
 (1)  This task does a test of the electrical circuit for the compressor discharge overheat switch. This task does not make sure that the compressor overheat switch is calibrated correctly. A calibration test of the overheat switch must be done off of the airplane.
 B. References
 (1)  
AMM 06-09-03/201, Body Section 44 Access Doors and Panels

 (2)  
AMM 24-22-00/201, Manual Control

 (3)  
WDM 21-51-21, WDM 21-51-22, WDM 21-51-23

 (4)  
SSM 21-51-02


 C. Access
 (1)  Location Zones
 133 Air Conditioning Equipment Bay, LH
 134 Air Conditioning Equipment Bay, RH

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-51-09
 ALL  ú ú 01 Page 204 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 (2)  Access Panel
 191A-L Air Conditioning Access Door
 192A-R Air Conditioning Access Door
 191H-L Air Conditioning Access Door

 D. Prepare for the Test
 S 862-037
 (1)  Open these circuit breakers, on the P6 Main Power Distribution Panel, and attach a DO-NOT-CLOSE tag:
 (a)  
6F35, PACK TEMP CONT A

 (b)  
6F36, PACK TEMP CONT B


 S 862-017
 (2)  
Supply electrical power (AMM 24-22-00/201).

 S 862-018

 (3)  
Make sure the applicable (1, 2, or 3) PACKS selector, on the overhead panel, P5, is in the NORM position.

 S 862-019

 (4)  
Make sure the EICAS message system operates normally.

 S 862-020

 (5)  
Push the ECS switch on the EICAS display select panel.

 S 012-021

 (6)  
Open the applicable access door (AMM 06-09-03/201):


 -191A-L for pack 1
 -191H-L for pack 2
 -192A-R for pack 3
 E. Do the Test
 S 022-022
 (1)  Disconnect the applicable electrical connector from the compressor discharge overheat switch:
 -DS520 for pack 1
 -DS517 for pack 2
 -DS522 for pack 3
 S 422-023
 (2)  
Install a jumper wire between pin 1 and pin 2 of the electrical connector.

 S 212-024

 (3)  
Make sure the SYS FAULT light on the applicable PACK RST switch on the P5 panel comes on.

 (4)  
Remove the jumper wire from the electrical connector.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 空调 AIR CONDITIONING 2(36)