• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-06 23:18来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 COMPRESSOR DISCHARGE OVERHEAT SWITCH - MAINTENANCE PRACTICES
____________________________________________________________
 1.  General_______
 A.  One compressor discharge overheat switch is installed at the forward end of each air cooling pack. This procedure has instructions to do the following tasks:
 (1)  
Remove the Compressor Discharge Overheat Switch

 (2)  
Install the Compressor Discharge Overheat Switch

 (3)  
Do the Compressor Discharge Overheat Switch Test.


 TASK 21-51-09-002-001
 2.  Remove the Compressor Discharge Overheat Switch (Fig. 201)_______________________________________________
 A.  References
 (1)  
AMM 06-09-03/201, Body Section 44 Access Doors and Panels

 (2)  
AIPC 21-51-09 Fig. 1

 (3)  
WDM 21-51-21, WDM 21-51-22, WDM 21-51-23

 (4)  
SSM 21-51-02


 B.  Access
 (1)  
Location Zone
 133 Air Conditioning Equipment Bay, LH
 134 Air Conditioning Equipment Bay, RH


 (2)  
Access Panel
 191A-L Air Conditioning Access Door
 192A-R Air Conditioning Access Door
 191H-L Air Conditioning Access Door

 

 C.  Prepare for the Removal
 S 862-002
 (1)  Make sure the applicable (1, 2, or 3) PACKS selector, on the overhead panel, P5, is in the OFF position.
 (a)  Put a DO-NOT-OPERATE tag on the selector.
 S 862-003
 (2)  Open the applicable circuit breaker, on the P180 DC Power Distribution Panel, and attach a DO-NOT-CLOSE tag:
 (a)  
180J2, PACK 1 PROT

 (b)  
180F2, PACK 2 PROT

 (c)  
180J17, PACK 3 PROT


 S 012-004
 (3)  Open the applicable access door (AMM 06-09-03/201):
 -191A-L for pack 1
 -191H-L for pack 2
 -192A-R for pack 3
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-51-09
 ALL  ú ú 01 Page 201 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

747-400 MAINTENANCE MANUAL
SEE A
SEE A
FWD
COMPRESSOR DISCHARGE DUCT
COMPRESSOR DISCHARGE TEMPERATURE BULB OVERHEAT SWITCH
ELECTRICAL CONNECTOR
A
Compressor Discharge Overheat Switch Installation
Figure 201

L56068
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-51-09
 ALL  ú ú 01 Page 202 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 D. Remove the Overheat Switch
 S 022-033
 (1) Disconnect the electrical connector from the overheat switch.
 -DS520 for pack 1
 -DS517 for pack 2
 -DS522 for pack 3
 S 022-034
 (2)
Cut and remove the lockwire from the overheat switch.

 S 022-007

 (3)
Use two wrenches to remove the overheat switch from the duct.


 NOTE: Use one wrench to hold the boss and the other wrench to
____
 turn the overheat switch.

 TASK 21-51-09-402-008
 3. Install the Compressor Discharge Overheat Switch (Fig. 201)
________________________________________________
 A. References
 (1)
AMM 06-09-03/201, Body Section 44 Access Doors and Panels

 (2)
AMM 20-11-28/401, Lockwire

 (3)
AIPC 21-51-09 Fig. 1

 (4)
WDM 21-51-21, WDM 21-51-22, WDM 21-51-23

 (5)
SSM 21-51-02


 B. Access
 (1)  
Location Zone
 133 Air Conditioning Equipment Bay, LH
 134 Air Conditioning Equipment Bay, RH


 (2)  
Access Panel
 191A-L Air Conditioning Access Door
 192A-R Air Conditioning Access Door
 191H-L Air Conditioning Access Door

 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 空调 AIR CONDITIONING 2(35)