• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-06 23:18来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 A.  The flight deck flow regulating valve is under the main deck floor panels forward of the wing gear wheel well in the mix bay.
 TASK 21-61-09-004-001
 2.  Flight Deck Flow Regulating Valve Removal (Fig. 401)
_________________________________________
 A.  References
 (1)  
SSM 21-25-05

 (2)  
WDM 21-25-51


 B.  Access
 (1)  Location Zone
 241 Main Deck, LH

 C.  Prepare for Removal
 S 864-002
 (1) Open these circuit breakers and attach DO-NOT-CLOSE identifiers:
 (a)  
Main power distribution panel, P6
 1) 6H31, FLT DK AIR FLOW CONT


 (b)  
Left power distribution center, P414 1) 414L12, FLT DK FLW REG FIRE CONT VALVE


 S 014-003
 (2)  Remove the floor panel that is over the valve at STA 1130, 45 inches to the left of the airplane centerline.
 NOTE: Remove the cargo handling harware, as required, to get access
____
 to the floor panel.

 D.  Remove the Valve
 S 034-004
 (1)  
Remove the electrical connector, DV552, from the valve.

 (2)  
Remove the two clamps from both ends of the valve.

 (3)  
Remove the valve.

 (4)  
Put covers over the duct openings.


 S 034-005
 S 024-006
 S 434-007
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-61-09
 ALL  ú ú 01F Page 401 ú Jun 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

747-400
MAINTENANCE MANUAL

FLIGHT DECK FLOW
REGULATING VALVE

SEE A
MIX BAY
FWD

VALVE
ACTUATOR

MAIN DISTRIBUTION MANIFOLD
ELECTRICAL CONNECTOR
CLAMP (2 LOCATIONS)
FLIGHT DECK FLOW REGULATING VALVE
A
Flight Deck Flow Regulating Valve Installation Figure 401
C23310
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-61-09
 ALL  ú ú 01F Page 402 ú Jun 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 TASK 21-61-09-404-008
 3. Flight Deck Flow Regulating Valve Installation (Fig. 401)
______________________________________________
 A. References
 (1)  
AMM 24-22-00/201, Manual Control

 (2)  
SSM 21-25-05

 (3)  
WDM 21-25-51


 B. Access
 (1)  Location Zone
 241 Main Deck, LH

 C. Install the Valve
 S 034-009
 (1)  Remove the covers from the duct openings.
 (a)  Make sure there is no unwanted material in the ducts.
 S 984-010
 (2)  Put the valve in its position between the ducts.
 (a)  Make sure the valve actuator is oriented facing aft.
 S 434-011
 (3)  
Install the two clamps on both ends of the valve.

 S 434-012

 (4)  
Install the electrical connector, DV552, on the valve.

 S 864-013

 (5)  
Remove the DO-NOT-CLOSE identifiers and close these circuit breakers:

 (a)  
Main power distribution panel, P6
 1) 6H31, FLT DK AIR FLOW CONT


 (b)  
Left power distribution center, P414 1) 414L12, FLT DK FLW REG FIRE CONT VALVE

 


 D. Do the Installation Test of the Valve
 S 864-017
 (1)  
Supply electrical power (AMM 24-22-00/201).

 S 864-018

 (2)  
Set the GND TESTS switch on the overhead maintenance panel, P461, to the ENABLE position.

 S 864-019

 (3)  
Prepare the CDU for the test:

 (a)  
Push the MENU key on the CDU to show the MENU.

 (b)  
Push the line select key (LSK) that is adjacent to <CMC to show the CMC MENU.

 


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 空调 AIR CONDITIONING 2(147)